Post featured image | Post title with a link | Categories | Post excerpt | project_client_nm | Post date |
---|---|---|---|---|---|
Al-Taj Pharma Plant | APFC, BC, Control System, FORM 2, FORM 4, Factory, Industrial, MDB, News | Jundi Electrical Industry part of TECO Group was awarded the supply of Main Distribution Board, Sub-Main Distribution Board, Motor Control Center, Automatic Power Factor Correction panels and Final Distribution Boards panels for Al-Taj Pharma Plant. All Panels were ready for delivery on 06.11.2024 |
Al-Taj Pharma | November 10, 2024 | |
ROYAL AUTOMOBILE CLUB MDB REPLACMENT | Building, FORM 2, MDB, News | Jundi Electrical Industry part of TECO Group was awarded the supply of MDB-ADMIN for THE ROYAL AUTOMOBILE CLUB JORDAN Panel was ready for delivery on 09.11.2024 |
Dasouki Trading Corporation | November 9, 2024 | |
Fire and Ambulance Building | Building, FORM 2, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of MDB to Arab Potash Fire and Ambulance Building Extension Project with Contractor Mohamed Al-Aidi & Sons Co. Ltd. The Panel was ready for delivery on 17-10-2024 |
Mohamed Al-Aidi & Sons Co. Ltd | October 17, 2024 | |
Tiper | APFC, Control System, FORM 2, Factory, MDB, News | Jundi Electrical Industry part of TECO Group was awarded the supply of MDB panels 4000A and 3200A including Automatic Power Factor Correction with Harmonic Filters 850KVAR and 600KVAR with advanced ABB Controllers for Tiper Project and the contractor is BURHANI POWERENGINEERS LTD All Panels were ready for delivery on 20.07.2024 |
BURHANI POWERENGINEERS LTD | July 27, 2024 | |
MCC Panel | Building, FORM 2, FORM 4, Factory, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of MCC FORM-4 Type and SMDB Panels for a factory Project To Manaseer Industrial Complex. All Panels were ready for delivery on 06.07.2024 |
Manaseer Industrial Complex | July 6, 2024 | |
Abd El Hadi Hospital – Extension | Building, FORM 2, Hospital, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of MDB and SMDB Panels for Abd El Hadi Hospital – Extension Project To Abd El Hadi Hospital. First Batch of SMDB Panels were ready for delivery on 01.06.2024 Second Batch consisting of MDB Panel was ready for delivery on 14.07.2024 |
Abd El Hadi Hospital | June 1, 2024 | |
AQABA LOGISTIC VILEGE | Building, FORM 2, MCC, News | Jundi Electrical Industry part of TECO Group was awarded the supply of MCC Panels for AQABA LOGISTIC VILEGE – Aqaba To Modern Jordanian For Industrial Supplies Panels were ready for delivery on 21.05.2024 |
Modern Jordanian For Industrial Supplies | May 21, 2024 | |
AL ADIAT Project | Building, FORM 2, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of a Panels for AL ADIAT Project To Dirar Saraireh Engineering & Contracting Company Panels were ready for delivery on 04.05.2024 |
Dirar Saraireh Engineering & Contracting Company | May 9, 2024 | |
Rajihi Bank – Aqaba | Building, FORM 2, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of All Panels for Rajihi Bank – Aqaba To Omar Wredat Contracting Company Panels were ready for delivery on 04.05.2024 |
Omar Wredat Contracting Company | May 5, 2024 | |
LV Panels Inquiry | Building, FORM 2, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of All Panels to Dasouki Trading Corporation. Panels were ready for delivery on 20.04.2024 |
Dasouki Trading Corporation | April 22, 2024 | |
MCC PANEL | Building, FORM 2, MCC, News | Jundi Electrical Industry part of TECO Group was awarded the supply of MCC Panels – Aqaba Project to Fayez Al-Jundi & Partner Co. Panels were ready for delivery on 06.04.2024 |
Fayez Al-Jundi & Partner Co. | April 7, 2024 | |
Aqaba port silos | Building, FDB, FORM 2, News | Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Aqaba port silos Project to Mohamed Al-Aidi & Sons Co. Ltd. Panels were ready for delivery on 18.01.2024 |
Mohamed Al-Aidi & Sons Co. Ltd. | January 18, 2024 | |
Brigade – 60 – Zarqa | APFC, ATS, Building, FDB, FORM 2, LV, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Brigade – 60 – Zarqa Project to Dirar Saraireh Engineering & Contracting Company First Batch of Panels were ready for delivery on 09.01.2024 |
Dirar Saraireh Engineering & Contracting Company | January 13, 2024 | |
KFAB RETROFIT STUDENT HOUSING | Building, FDB, FORM 2, LV, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for KFAB RETROFIT STUDENT HOUSING Project to The Morganti Group, Inc. Panels were ready for delivery on 27.12.2023 |
The Morganti Group, Inc. | December 27, 2023 | |
Autotransformer Panel 110KW | ATST, FORM 2, LV, MCC, News | Jundi Electrical Industry part of TECO Group was awarded the supply of ATST 110KW to Miyahuna Water Company. Panels were ready for delivery on 18.10.2023 |
Miyahuna Water Company | November 22, 2023 | |
SIB – Zanbaka Branch | Building, FDB, FORM 2, LV, MCC, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to SIB – Zanbaka Branch for TANFEEZ.MEP Contractor. Panels were ready for delivery on 26.10.2023 |
TANFEEZ.MEP | October 26, 2023 | |
Marj School | Building, FORM 2, LV, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Marj School for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 17.09.2023 |
Ismail Al Hersh Company for Contracting. | September 17, 2023 | |
Proposed Megapipes Weholite Factory | ATS, FDB, FORM 2, Factory, LV, MDB, News, SMDB, SYNC | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Proposed Megapipes Weholite Factory for BURHANI POWERENGINEERS LTD. Panels were ready for delivery on 28.05.2023 |
BURHANI POWERENGINEERS LTD | June 7, 2023 | |
LV Panel | Building, FORM 2, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of for a SMDB Panel Panels were ready for delivery on 29.05.2023 |
Dasouki Trading Corporation | June 6, 2023 | |
Commercial Building Rehabilitation | Building, FORM 2, MP, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels for a commercial building rehabilitation. Panels were ready for delivery on 27.02.2023 |
Cash Customer | March 2, 2023 | |
Saroo Villa | Building, FDB, FORM 2, LV, MCC, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Saroo Villa PROJECT for Mr. MOATH YOUSEF JABER. Panels were ready for delivery on 17.01.2023 |
MOATH YOUSEF JABER | January 18, 2023 | |
KILOMBERO K4 EXPANSION PROJECT | FORM 2, Factory, LV, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to KILOMBERO K4 EXPANSION PROJECT for BURHANI POWERENGINEERS LTD Panels were ready for delivery on 10.12.2022 |
BURHANI POWERENGINEERS LTD | December 13, 2022 | |
Marine Infantry Battalion | Building, Commercial, FORM 2, FORM 4, LV, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Marine Infantry Battalion for Mohamed Al-Aidi & Sons Co. Ltd. Panels were ready for delivery on 10.12.2022 |
Mohamed Al-Aidi & Sons Co. Ltd. | December 11, 2022 | |
Ajloun Classrooms Building | Building, FORM 2, LV, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Ajloun Classrooms Building for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 05.11.2022 |
Ismail Al Hersh Company for Contracting | November 6, 2022 | |
Fire Fighter Building – Aqaba | Building, FORM 2, LV, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Fire Fighter Building – Aqaba for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 22.10.22 |
Ismail Al Hersh Company for Contracting | October 22, 2022 | |
Aqaba Health Center | Building, FORM 2, Hospital, LV, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Aqaba Health Center for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 22.10.22 |
Ismail Al Hersh Company for Contracting | October 22, 2022 | |
MDB Panel – The Bishops School for Boys | Building, FORM 2, LV, News, SMDB | Jundi Electrical Industry part of TECO Group was awarded the supply of MDB Panel for The Bishops School for Boys. Panel was ready for delivery on 15.08.22 |
The Bishops School for Boys | August 21, 2022 | |
Electrical panel – Jordan Petroleum Refinery Co. LTD | FORM 2, Factory, LV, MCC, News | Jundi Electrical Industry part of TECO Group was awarded the supply of Special MCC Panel for Modern Jordanian For Industrial Supplies for Jordan Petroleum Refinery Co. LTD Panel was ready for delivery on 08.08.22 |
Modern Jordanian For Industrial Supplies | August 9, 2022 | |
Waste Water Treatment Plant In Shidia Mines | ATS, Control System, FORM 2, FORM 4, LV, MCC, MDB, News, SCADA & Automation, SMDB, Waste Water Treatment Plant (WWTP) | Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, PLCs, and DB Panels for a private contractor for Waste Water Treatment Plant In Shidia Mines All panels were ready for delivery on 20.05.2022 |
Private Contractor | August 1, 2022 | |
Baoon School Ajloun | Building, FORM 2, LV, MCC, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for INDUSTRIAL JORDAN RAWABI for Baoon School Project in Ajloun (Saudi Grant Fund) All panels were ready for delivery on 19.05.22 3D Model for all panels is included. |
INDUSTRIAL JORDAN RAWABI | May 19, 2022 | |
Tabarbour School | Building, FORM 2, LV, MCC, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for Reef Contracting for Tabarbour School Project All panels were ready for delivery on 21.02.20 |
Reef Contracting | February 21, 2022 | |
Military Establishment Warehouses Khaw | Building, FORM 2, LV, MCC, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Abd Al Rahman Al Abweh Contracting Company for Military Establishment Warehouses in Khaw. All panels were ready for delivery on 14.02.2022 |
Abd Al Rahman Al Abweh Contracting Company | February 15, 2022 | |
USAID Schools Project | Building, FORM 2, MCC, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Dirar Saraireh Engineering & Contracting Company for 3 USAID Schools named: |
Dirar Saraireh Engineering & Contracting Company | December 12, 2021 | |
Um Batamah Girls School | Building, FORM 2, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of MDB Panel related to Project Um Batamah Girls School for Shabab Contracting Company. Panel was ready for delivery on 03-08-2021 |
Shabab Contracting Company | August 3, 2021 | |
Airforce Base Project | Building, FORM 2, MCC, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Ismail Al Hersh Company for Contracting Company related to the Jordanian Airforce Project. All Panels were ready for delivery on 02.08.2021 |
Ismail Al Hersh Company for Contracting | August 2, 2021 | |
SMDB AC | Building, FORM 2, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of two SMDB AC Panels for Arab Bank – Head Quarters Amman |
Arab Bank - HQ | June 27, 2021 | |
MCC Panel | Building, FORM 2, MCC, News | Jundi Electrical Industry part of TECO Group won the supply of MCC Panel for a cash customer |
Cash Customer | May 30, 2021 | |
Combined ATS Panel for 4 Electric Meters | ATS, Building, FORM 2, News | all panels related to Project named Combined ATS Panel for 4 Electric Meters for United Nations Office for the Coordination of Humanitarian Affairs (OCHA),Amman |
United Nations - Amman Office | May 10, 2021 | |
SMDB Panel | Building, FORM 2, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of an MDB Panel for related to a project name SMDB Panel for The International Centre for Synchrotron-light for Expremental Science and Applications in the Middle East (SESAME) |
The International Centre for Synchrotron-light for Expremental Science and Applications in the Middle East (SESAME) | May 10, 2021 | |
Private Villa MDB Panel | Building, FORM 2, MDB, News | Jundi Electrical Industry part of TECO Group won the supply of an MDB Panel for related to a project name Private Villa for client Al-Dasoqi trading company |
Al-Dasoqi trading company | May 6, 2021 | |
LV Panels | Building, FDB, FORM 2, News, SMDB | supply of all panels to Engineering and Maintenace Group. |
Engineering and Maintenace Group | April 3, 2021 | |
Sama Sarhan School | Building, FDB, FORM 2, News, SMDB | all panels related to Project named Sama Sarhan School |
Gaziantep for Contracting & Construction L.C.C. | March 25, 2021 | |
Ministry of Finance – MCC Panels | Building, FORM 2, MCC, News | Completion of fifth batch for the LV Switchgear (MCC Panels) related to TECO Project No. 17082/TC named Ministry of Finance Complex (MOF). |
Dirar Saraireh Engineering & Contracting Company | February 3, 2021 | |
Fine VFD Panel | FORM 2, Factory, MCC, News, VFD | fabrication works for 3x75KW and 1x22KW VFD Panel for M/S F.A. Kettaneh and end client is Fine Hygenic Holding Company. |
F.A. Kettaneh | February 3, 2021 | |
Tender 9-2020 – Supply of Starter Panels | ATST, FORM 2, News, Pumping Station | Tender of 9-2020 to supply 73 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan. |
Water Authority of Jordan | December 21, 2020 | |
KARAMEH BORDER X-Ray Station | Building, FDB, FORM 2, News, SMDB | Supply of all panels related to Project named KARAMEH BORDER X-Ray Station |
Darko Constructions Co. | December 17, 2020 | |
ChangeOver ATS 125A 4P | ATS, FORM 2, News | Supply of Automatic Transfer Swtich ChangeOver Type 125A 4P |
Darko Constructions Co. | November 21, 2020 | |
ATS 60A CONTACTOR TYPE | ATS, FORM 2, News | supply of 2 x Automatic Transfer Swtich 60A CONTACTOR Type with Bypass |
Free Engineering Contacting Company | November 9, 2020 | |
Tender 3-SUPPLY-GIZ-2020 – Supply of Starter Panels | ATST, FORM 2, News, Pumping Station | tender of 3-SUPPLY-GIZ-2020 to supply 17 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan. |
Water Authority of Jordan | October 11, 2020 | |
Supply of RITTAL KS Enclosures | News, Projects | Jundi Electrical Industry – Part of TECO Group won the supply of various sizes of RITTAL Cooling Units to SAMRA Electric Power Co. |
Mega Tech | July 27, 2020 | |
Supply of RITTAL Top Therm Cooling Units – Blue e | News, Projects | Jundi Electrical Industry – Part of TECO Group won the supply of various sizes of RITTAL Cooling Units to SAMRA Electric Power Co. |
SAMRA ELECTRIC POWER CO. | July 11, 2020 | |
ATST 90KW – Autotransformer Panel | ATST, FORM 2, MDB, News, Pumping Station | Jundi Electrical Industry part of TECO Group won the supply 90KW Auto transformer Panel for Engineering Sense LLC Company. Panels was ready for delivery on 20-6-2020 Share this entry Share on Facebook Share on X Share on LinkedIn Share by Mail |
Engineering Sense LLC | June 21, 2020 | |
G1 Modified Factory – Qatar | APFC, FDB, FORM 2, FORM 4, Factory, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for G1 Modified Factory – Qatar with Negem Co For Engineering & Contracting Supply of All Distribution Boards Main Distribution Boards Form 4 Sub-main Distribut |
Negem Co For Engineering & Contracting | June 20, 2020 | |
Intercontinental Panels Rehabilitation | FORM 2, MCC, News | Jundi Electrical Industry part of TECO Group won the supply of Intercontinental MCC Panels Rehabilitation for Free Engineering Contracting Company Panels were ready for delivery on 09-06-2020 Share this entry Share on Facebook Share on X Share on Linke |
Free Engineering Contacting Company | June 11, 2020 | |
2020 | Super Doll Panel | APFC, FDB, FORM 2, FORM 4, Factory, MDB, News, Projects, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all switchgear panels related to Super Doll Project. Client: Burhani Power Engineers LTD. Share this entry Share on Facebook Share on X Share on LinkedIn Share by Mail |
BURHANI POWERENGINEERS LTD | March 9, 2020 |
Feeder Pillar Project | FORM 2, MCC, News | Jundi Electrical Industry part of TECO Group won the supply of ATS 800A Panel related to RFQ 36-2019 – Car Park ATS Panel to Arab Bank. Panels were ready for delivery on 29-05-2019 Share this entryShare on FacebookShare on XShare on LinkedInShare by Ma |
Free Engineering Co. F.E.C | January 29, 2020 | |
The Royal Palace (Jordan) P500 – Special DB Panel | FDB, FORM 2, News | Supply of All Distribution Boards Main Distribution Boards Form4 Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center First batch was finalized on 3.05.2017 Share this entryShare on FacebookShare on XShare on LinkedInShare b |
The Royal Palace (Jordan) | January 8, 2020 | |
Extension of National Center for Diabetes – MCC Panels | FORM 2, Hospital, MCC, News, VFD | Supply of All Distribution Boards Main Distribution Boards Form4 Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center First batch was finalized on 3.05.2017 Share this entryShare on FacebookShare on XShare on LinkedInShare b |
Anas Anani & Partners Co. | January 5, 2020 | |
Libya Starter Panels | FORM 2, MCC, News | Jundi Electrical Industry part of TECO Group won the supply of ATS 800A Panel related to RFQ 36-2019 – Car Park ATS Panel to Arab Bank. Panels were ready for delivery on 29-05-2019 Share this entryShare on FacebookShare on XShare on LinkedInShare by Ma |
Free Engineering Co. F.E.C | November 20, 2019 | |
Vegetable Market – WM | Building, FDB, FORM 2, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for Vegetable Market in Wadi Mousa with International New Technical Est. Project Consultant: Sobeh Engineering Consulting Office Supply of All Distribution Boards M |
International New Technical Est. | October 17, 2019 | |
3 PV plants project | FORM 2, Factory, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for Ghabawi Fridge Project with E-Jaz Contracting Co. End Client: Jordan Armed Forces. Project Consultant: Jordan Armed Forces. Supply of All Distribution Boards Ma |
Associated Transtech Contracting - ASTRACO | September 5, 2019 | |
JUST Computer Lab – Irbid | Building, FDB, FORM 2, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for JUST Computer Lab Building – Irbid with Imkan Contracting Company. End Client: Jordan University of Science and Technology – JUST Supply of All Distribution Boa |
Imkan Contracting Company | September 1, 2019 | |
JUST Nano Technology – Irbid | Building, FDB, FORM 2, MDB, News, SMDB | Main Distribution Boards Form 2 Sub-main Distribution Boards Form 2 Final Distribution Boards |
Imkan Contracting Company | September 1, 2019 | |
RFQ 36-2019 – ATS 800ِA Panel | ATS, Building, FORM 2, MDB, News | Jundi Electrical Industry part of TECO Group won the supply of ATS 800A Panel related to RFQ 36-2019 – Car Park ATS Panel to Arab Bank. Panels were ready for delivery on 29-05-2019 Share this entryShare on FacebookShare on XShare on LinkedInShare by Ma |
Arab Bank - HQ | June 25, 2019 | |
Ghabawi Fridge | FORM 2, Factory, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for Ghabawi Fridge Project with E-Jaz Contracting Co. End Client: Jordan Armed Forces. Project Consultant: Jordan Armed Forces. Supply of All Distribution Boards Ma |
E-Jaz Contracting Co. | June 1, 2019 | |
Warheads Manufacturing Building | FDB, FORM 2, Factory, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for Warheads Manufacturing Building Project with Anas Anani & Partners Contracting Co. End Client: Jadara Equipment & Defense Systems Jordan Project Consult |
Anas Anani & Partners Contracting Co. | June 1, 2019 | |
Wadi Mousa Central City Development | Building, FDB, FORM 2, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for Wadi Mousa Central City Development with International New Technical Est. Project Consultant: Sobeh Engineering Consulting Office Supply of All Distribution Boa |
International New Technical Est. | May 14, 2019 | |
Radiotherapy Center | FDB, FORM 2, Hospital, MCC, MDB, News, SMDB | Jundi Electrical Industry part of TECO Group won the supply of all LV Electrical panels for Radio Therapy Project with Mohammad Ahmad Abu Eisha & Brothers Contracting Company. Project Consultant: DAR AL OMRAN Supply of All Distribution Boards Main |
Mohammad Ahmad Abu Eisha & Brothers Contracting Company | April 22, 2019 | |
ATS Panels Package | ATS, Building, FORM 2, News | Supply of ATS 2500A 4P ACB Type Drawout. Breakers are from M/S Schneider Electric Cabinets are from M/S RITTAL ATS Controller is from M/S Woodward Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Free Engineering Co. F.E.C | April 18, 2019 | |
RFQ 265-2018 – ATS and MDB Panels | ATS, Building, FORM 2, MDB, News | Jundi Electrical Industry part of TECO Group won the supply of ATS and MDB Panels related to RFQ 265-2018 including delivery to Arab Bank building – COU – Airport Street – Panels were ready for delivery on 10-2-2019 Share this entryShare on FacebookSha |
Arab Bank - HQ | February 11, 2019 | |
JUST Veterinary Hospital – Irbid | FDB, FORM 2, FORM 4, Hospital, MCC, MDB, News, SMDB | Main Distribution Boards Form 4 Sub-main Distribution Boards Form 2 Motor Control Centers Final Distribution Boards |
INDUSTRIAL JORDAN RAWABI | January 28, 2019 | |
Ministry Finance Complex | APFC, Building, FDB, FORM 2, FORM 4, MCC, MDB, News | Main Distribution Boards Form 4 Sub-main Distribution Boards Form 2 Motor Control Centers Final Distribution Boards Automatic Power Factor Correction Panel |
Derar Saraireh & Sons for Engineering & Contracting | January 23, 2019 | |
Sync and MDB Panel | FORM 2, Factory, Industrial, MDB, News, SYNC | Supply of Lighting Control Panel According to client’s requirements All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Al Jazy Trading | August 14, 2018 | |
PLC Panel and Automation Consultation Services for Uranium Pilot Plant Project | Contracting, Control System, FORM 2, Factory, News | Supply of PLC cabinet for Area 100 called PLC-100 and according to client’s requirement and needs All Automation components are based on M/S Siemens S7-1200 Solution. Cabinets are from M/S RITTAL Share this entryShare on FacebookShare on XShare on Link |
JORDANIAN URANIUM MINING COMPANY (JUMCO) | May 21, 2018 | |
MCC Panel | Building, FORM 2, MCC, News | Supply of Motor Control Center for Bank According to client’s requirements All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL |
Arab bank - Amman | May 21, 2018 | |
DB panel requirement in Arab Potash Company | FORM 2, Factory, Industrial, MCC, News | Supply for a special distribution board for Megha Engineering & Infrastructures Ltd to be installed in Arab Potash Company Enclosures are supplied from M/S RITTAL Germany Breakers and Components are supplied from M/S Schneider Electric Internationa |
Megha Engineering & Infrastructures Ltd. | May 16, 2018 | |
SMDB Panel for Crown Plaza Amman | FORM 2, Hotel, News, SMDB | Supply of Sub-Main Distribution Board for Hotel According to client’s requirements All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL Share this entryShare on FacebookShare on XShare on LinkedI |
Crown Plaza Amman | February 4, 2018 | |
Lighting Panel for kiln substation | FORM 2, Factory, News, SMDB | Supply of Lighting Control Panel According to client’s requirements All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Manaseer - Modern Cement & Mining Co. | February 4, 2018 | |
APC Wireless Rehabilitation | Contracting, Control System, Factory, Wireless Microwave | Emergency rehabilitation of wireless system which was supplied by TECO Group about 10 years ago. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Arab Potash Company (APC) | December 17, 2017 | |
RFQ 2017-4103 Electrical panel for shredder machine | FORM 2, Factory, News, ST | Supply of Motor Control Center (MCC) Two soft starters 75KW each. Two DOL starters. Interlocks as customer required. Remote control facility. All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL |
Manaseer - Modern Cement & Mining Co. | December 13, 2017 | |
Prince Hamzah Rehabilitation Project | Contracting, Control System, FORM 4, Factory, Hospital, MDB, News | Jundi Electrical Industry part of TECO Group has been awarded a contract for the rehabilitation of the Main Electrical Panels of Pricne Hamzah Hospital and the creation of a new Control System to control the Incomers, Bus Coupler, Sync Panel, etc. All |
Ministry of Health | November 18, 2017 | |
Mas Factory Electical Panels | APFC, FORM 2, Factory, MDB, News | Supply of Distribution Boards Main Distribution Board Form 2. Automatic Power Factor Correction Panel. All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL Share this entryShare on FacebookShare |
Mas Factory | November 1, 2017 | |
Al-Kindi Hospital | APFC, FDB, FORM 2, FORM 4, Hospital, MCC, MDB, News, SMDB | Main Distribution Boards Form-4b Automatic Power Factor Correction Boards Sub-main Distribution Boards Form-2b Motor Control Centers Final Distribution Boards |
Hiba Engineering Company | September 18, 2017 | |
Supply and Installation of ATS 250A | ATS, Contracting, FORM 2, News | Supply and Installation of Automatic Transfer Switch 250A (ATS 250A) based on standard ATS design. More details can be found here. According to client’s requirements Cabinets are from M/S RITTAL Share this entryShare on FacebookShare on XShare on Linke |
Abdul Hameed Shoman Foundation | August 21, 2017 | |
School Project | Building, FORM 2, MCC, MDB, MP, News | Supply of Distribution Boards Main Distribution Board Form 2. External Lighting Board Form 2. Motor Control Center Form 2. All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL Share this entrySha |
Al Laith Enginering and Contracting Co. | April 22, 2017 | |
Jordan House RHC Metering Devices | Control System, Distributed Control System, News, SCADA & Automation | Jundi Electrical Industry part of TECO Group wins a supply & installation contract job with The Hashimite Royal Court to supply complete metering solution where about 40 units of PM2120 will be connected via Modbus RS485 to master station EBX510 fo |
The Hashimite Royal Court | April 20, 2017 | |
LV Panels | Building, FORM 2, MCC | Supply of MCC Panel according to clients requirements All Breakers and components are supplied from M/S Schneider Electric World Wide Cabinets are from M/S RITTAL Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Smart Works Design Works | April 5, 2017 | |
CONSTRUCTION OF 2500 MT SRC CEMENT STEEL SILO FOR LINE-2 | Control System, Distributed Control System, FORM 4, Factory, MCC, News, SCADA & Automation | Jundi Electrical Industry part of TECO Group wins a supply contract job with Al-Ghanem Trading & Cont. Co. Ltd. To supply intelligent MCCs with special protection relays to be connected to an existing DCS system at customer premises. All Breakers a |
Al-Ghanem Trading & Cont. Co. Ltd. | March 29, 2017 | |
APC REPLACEMENT OF FIREFIGHTING PUMPS AND FIRE MAIN AT HLP AREA | Control System, FDB, FORM 2, Factory, Fiber Optic, MCC, MDB, News, SCADA & Automation, SMDB | Supply of MDB, SMDB, Lighting Panel, PLC RTU with Fiber Optic Communication and DC UPS System Including Mini SCADA System based on Siemens S7-1200 Breakers are from M/S Schneider Electric Cabinets are from M/S RITTAL PLC Controllers are from M/S SIEMEN |
Elaf Contracting Co. | March 26, 2017 | |
Airport FreeZone WWTP – ATS Panel | ATS, FORM 2, News, Waste Water Treatment Plant (WWTP) | Supply of ATS 2500A 4P ACB Type Drawout. Breakers are from M/S Schneider Electric Cabinets are from M/S RITTAL ATS Controller is from M/S Woodward Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Free Engineering Co. F.E.C | February 2, 2017 | |
Biosphere – Electric Panels | FORM 2, Factory, MCC, SMDB | Supply of Main, Sub-Main and MCC Panels for Factory According to client’s requirements All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL Share this entryShare on FacebookShare on XShare on Lin |
Imad Jundi & Partners Co. | January 27, 2017 | |
Downtown Palace of Justice | APFC, Building, FDB, FORM 2, MCC, MDB, News, SMDB | Supply of All Distribution Boards Main Distribution Boards Form2 Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center |
Hiba Engineering Company | January 23, 2017 | |
SESAME XAFS beam-line Power Panel and Cable Tray | Contracting, FORM 2, Factory, News, SMDB | Complete Contracting Job including the following: 1- Cable Tray supplied by M/S Metskan Turkey. 2- Cable Tray Installation Accessories supplied by M/S Fischer. 3- Supply and Installation of Low Voltage Switchgear where the installation is performed by |
SESAME | December 20, 2016 | |
Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 42-2016 | ATST, News, Projects, Pumping Station | 6 Autotransformer standalone starters during November-2016 of 60KW range to Water Authority of Jordan. Schneider Electric Components along with RITTAL enclosures combined for a superior quality product. Project was completely finalized on 08-11-2016. S |
Water Authority of Jordan | October 29, 2016 | |
Arab Mining Company and Arab Mining industrial development institute | Building, FDB, FORM 2, FORM 4, MCC, MDB, News, SMDB | Main Distribution Boards Form4 Type Prisma P Submain Distribution Boards Form2 Final Distribution Boards that are connected to Building Management System (BMS) Motor Control Center that are connected to Building Management System (BMS) |
Derar Saraireh & Sons for Engineering & Contracting | October 27, 2016 | |
Miyahuna Autotransformer Starter Panels Tender O-T-16-0011-ZARQA | ATST, News, Pumping Station | 20 Autotransformer standalone starters were awarded to TECO Group – Jundi Electrical Industry during June-2016 ranging from 50KW to 150KW to Miyahuna Water Company. Schneider Electric Components along with RITTAL enclosures combined for a superior qual |
Miyahuna Water Company LLC. | August 30, 2016 | |
SESAME Storage Ring and RF Electrical Distribution Infrastructure | Contracting, FDB, FORM 2, FORM 4, Factory, MDB, News, SMDB | Complete Contracting Job including the following: 1- Cable Tray supplied by M/S Lami Trading. 2- Cabling System supplied by M/S National Cable & Wire Mfg. Co. (CABLECO) 3- Supply and Installation of Low Voltage Switchgear where the installation is |
SESAME (Synchrotron-light for Experimental Science and Applications in the Middle East) | May 1, 2016 | |
Modern Eyes Hospital Amman | FDB, Hospital, MCC, MDB, News, SMDB | Supply of All Distribution Boards Type Tested Main Distribution Boards Form4 Based on RITTAL Ri4Power Solution Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center Share this entry Share on Facebook Share on X Share on Linke |
Anas Anani & Partners Co. | May 1, 2016 | |
Extension of National Center for Diabetes | FDB, FORM 2, FORM 4, Hospital, MCC, MDB, News, SMDB | Supply of All Distribution Boards Main Distribution Boards Form4 Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center First batch was finalized on 3.05.2017 Second batch (MCC Panels) was finalized on 31.12.2019 MCC Panels Sh |
Anas Anani & Partners Co. | April 13, 2016 | |
THE JUDICIAL INSTITUTE OF JORDAN | Building, FDB, FORM 2, MCC, MDB, News, SMDB | Supply of All Distribution Boards Main Distribution Boards Form2 Sub-main Distribution Boards Form2 Final Distribution Boards Motor Control Center All items were supplied to project site on 31-07-2018 Share this entry Share on Facebook Share on X Share |
Anas Anani & Partners Co. | April 13, 2016 | |
Expansion of Iman Hospital – Ajloun | FDB, Hospital, MCC, MDB, News, SMDB | Supply of All Distribution Boards Main Distribution Boards Form4 Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Al-Muhandes Contracting Co | April 13, 2016 | |
King Hussien Cancer Center (KHCC) | BC, FDB, Hospital, MDB, News, SMDB, VFD | All low voltage switchgear for King Hussien Cancer Center (KHCC Project). All Panels: LT, MDB, SMDB, MCC and DB were supplied to the project from the company’s Free Zone Factory in Sahab Schneider Electric Components along with RITTAL enclosures combin |
Joint Venture Consolidated Contractors Group SAL Offshore CCC And Haddadin Engineering Co. For Contracting. | April 12, 2016 | |
Lighting Panels Al Quisemah Stadium Rehabilitation | Commercial, MCC, News, Projects | Supply of All Distribution Boards Main Distribution Boards Form2 Advanced Lighting Panels for Stadium Light with remote control and forced cooling Share this entry Share on Facebook Share on X Share on LinkedIn Share by Mail |
AlEdwan Contracting Company | April 1, 2016 | |
Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 12-2015 | ATST, News, Projects, Pumping Station | 49 Autotransformer standalone starters during November-2015 ranging from 30KW to 250KW to Water Authority of Jordan. Schneider Electric Components along with RITTAL enclosures combined for a superior quality product. |
Water Authority of Jordan | November 12, 2015 | |
Crown Plaza Amman | Hotel, MCC, News, SMDB | Supply of All Distribution Boards Main Distribution Boards Form2 Submain Distribution Boards Form2 Motor Control Center Advanced Lighting Panels Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Imad Jundi & Partners Co. | April 13, 2015 | |
PLASCO LV Switchgear | APFC, Factory, MCC, News, Projects, SYNC | Supply Low voltage Switchgear Schneider Components and RITTAL Enclosures Ri4Power Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
BURHANI POWERENGINEERS LTD | April 13, 2015 | |
King Abdullah Gardenz PK2 and Zone1 and 2 | Commercial, Control System, MCC, MDB | Supply of All Distribution Boards Main Distribution Boards Form4 Submain Distribution Boards Form2 Lighting Panels with Advanced PLC Control Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Aldaleel Electromechanical Contracting EST. | April 13, 2014 | |
Iraq Hospital | APFC, ATS, BC, Commercial, Hospital, LV, MCC, MDB, Projects, SMDB, ST, Switchgear | Supply 3 Major Hospitals in IRAQ (Al Qaem, Heet, Haditha) the following per hospital: Main Distribution Boards Form4 consisting of 3 Incomers 3200A and 2 Buscouplers 3200A with different rated feeders. Submain Distribution Boards Form2 Final Distributi |
Epsilon Engineering Company | January 6, 2014 | |
Wadi Shallala Irbid WWTP | Control System, Distributed Control System, Fiber Optic, MIMIC, Waste Water Treatment Plant (WWTP) | Municipal waste water treatment plant, Wadi Shallalah, Jordan Capacity: 164,000 PE / 22,289 m³/d Planning, design, supply and commissioning of mechanical and electrical equipment and SCADA system of a biological wastewater treatment plant with sludge t |
Passavant Roediger GmbH | January 6, 2014 | |
Miyahuna – Rehabilitation of Muwaggar PS and Wells TENDER C-T-11-0043 | Contracting, Distributed Control System, GPRS, Pumping Station, SCADA & Automation | Owner : Miyahuna Water Company Location : Muwaggar , Jordan Commissioning date : 2012 Project Description Design, Supply, Installation and Commissioning of: Remote Control & Monitoring System for the Main Pumping Station and 8 Outstation Wells thro |
Miyahuna Water Company LLC. | January 6, 2014 | |
Automatic Power Factor Correction Panels | APFC | Supply of branded Automatic Power Factor Correction Quantity 9 with 350KVAr rating. Click to enlarge Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Global Power Solutions | June 1, 2013 | |
Basrah Sport City – IRAQ | Commercial, MV | 11kV Medium Voltage Switchgear GE PowerVAC (28 Cubicles) 11kV Indoor Load Interrupt Fused Switches (Qty 12) 11kV Outdoor Pad Mounted Interrupt Fused Switches (Qty 22) Spare Parts for above |
Abdullah Owayez Hammood Al-Juboori | January 6, 2013 | |
Queen Alia International Airport Access Control Panels | Commercial, MCC | Supply of Access Control Panels & Accessories |
Johnson Controls | January 6, 2012 | |
Autotransformer Starters | ATST, Pumping Station | Supply of: 23 No. of Autotransformer Starter Panels up to 250kW |
Water Authority of Jordan | January 6, 2012 | |
Autotransformer Starter Panel 550KW | ATST, Pumping Station | Supply of 550KW Autotransformer Starter Panel. Click to enlarge Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Yarmouk Water Co. L.L.C. | June 1, 2011 | |
Spinneys TAJ Mall Branch | APFC, ATS, Building, MCC, MDB, SMDB | Supply of All Distribution Boards Main Distribution Boards Form2 Submain Distribution Boards Form2 Lighting Panels With Advanced Controllers Automatic Transfer Switch Motor Control Center Share this entryShare on FacebookShare on XShare on LinkedInShar |
Ahmad Badaweih Est. | April 13, 2011 | |
Canadian Embassy (Jordan) | APFC, Building, MCC, MDB, SMDB | Supply of: Low Voltage Switchgear Submain Distribution Boards Motor Control Centers Final Distribution Boards |
Jordan Electro Mechanical EST.(JEME) | January 6, 2011 | |
600KVAr Automatic Power Factor Correction | APFC, Commercial, Projects | Supply of 4 No. 600KVAr Automatic Power Factor Correction Panels |
WESTPOINT HOME BAHRAIN W.L.L. | January 6, 2011 | |
SOFTY Chemical Manufacturing Plant | FDB, Factory, MCC, MDB, SMDB | Supply of: Main Distribution Boards. Submain Distrubution Boards. Motor Control Centers. Final Distribution Boards |
United Electromechanical International | January 6, 2011 | |
Public Security Department Head Quarters (PSD) | APFC, Building, FDB, LV, MCC, MDB, SMDB | Supply of: Main Distribution Boards (MDBs) Type Schneider Electric Prisma Plus Type Tested Switchboards Main Distribution Boards. Submain Distrubution Boards (SMDBs) Motor Control Centers (MCCs) Automatic Power Factor Correction Panels with Harmonic Fi |
DURRAT AL QASEM CONTRACTING CO. | January 6, 2011 | |
Arab Potash Company (APC) Plant Optimization and Production Expansion Solar Ponds | Contracting, Distributed Control System, Factory, Wireless Microwave | Owner : Arab Potash Company Location : Ghor Safi Commissioning date : July 2009 Project value : 3,579,000 JD Consultant: Joint Venture HATACH & Dar Al Handasah Contractor : China International Water & Electric Corp. A- INTRODUCTION The Solar P |
Arab Potash Company | January 6, 2011 | |
Supply of Autotransformer Starter Panels | ATST, Pumping Station | Supply of 13No. Autotransformer Starter Panels of various sizes. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Miyahuna Water Company LLC. | June 1, 2010 | |
Syringe Modern Factory | APFC, FDB, Factory, MCC, MDB, SMDB | Supply of All Distribution Boards Main Distribution Boards Form4 Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center Automatic Transfer Stwitch Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
ALPHA Refregeration and Conditioning Est. | April 13, 2010 | |
Black Iris Ship Synchronizing Panel | Industrial, Projects, SYNC | Supply of: Generator Synchronizing Panel (3 Gensets) |
Jordan Tractor & Equipment Co. | January 6, 2010 | |
Alrai Press | Building, MCC, MDB, SMDB | Supply of: Main Distribution Boards. Submain Distrubution Boards. Motor Control Centers. |
Al-Muhandes Contracting Co | January 6, 2010 | |
Expansion of Karak Hospital | Hospital, MCC, MDB, SMDB | Supply: Main Distribution Boards Submain Distribution Boards Motor Control Centers Final Distribution Boards |
DURRAT AL QASEM CONTRACTING CO. | January 6, 2010 | |
Housing and Urban Development WWTP | Control System, MCC, Waste Water Treatment Plant (WWTP) | 5 Compact Water Treatment Plants Project MAIN DISTRIBUTION BOARDS MOTOR CONTROL CENTERS COMPLETE COMPACT SCADA SOLUTION PLC CABINETS WITH BUILTIN HMI |
Aqua Treat | January 6, 2010 | |
Muwaggar Waste Water Treatment Plant (WWTP) | Control System, Distributed Control System, Fiber Optic, MCC, MDB, SMDB, VFD, Waste Water Treatment Plant (WWTP) | Supply of: Main Distribution Boards Submain Distribution Motor Control Centers Complete Water Treatment PLC Control System. Complete Water Treatment SCADA System. Complete Water Treatment Instrumentation |
Ali Zoubi Sons Contracting CO. | January 6, 2010 | |
4 Star Hotel Aqaba – DoubleTree By Hilton | APFC, Hotel, MCC, MDB, SMDB | Supply of All Distribution Boards Main Distribution Boards Form4 Submain Distribution Boards Form2 Motor Control Center Supply of Busduct Busbar System Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Kildani Engineering & Contracting (KEC) | April 15, 2009 | |
JORDAN TELEVISION BUILDING-AQABA | Building, MCC, MDB, SMDB | Supply of All Distribution Boards Main Distribution Boards Form2 Submain Distribution Boards Form2 Motor Control Center Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Abdel Rahman Al Abweh | April 13, 2009 | |
Expansion of Jordan University of Science & Technology | APFC, Building, MCC, MDB, SMDB | Supply of: Main Distribution Boards Submain Distribution Boards Motor Control Centrers Final Distribution Boards |
Ahmad Badaweih Est. | January 6, 2009 | |
33/11 kV Substation Metering Systems (NEPCO) | Industrial, MP | Supply of: Supply of Computrized Tariff Metering Systems for New 33/11kV Substations and Existing ones for the National Electric Power Co |
Tareq Technical Engineering Co. | January 6, 2009 | |
Hussari Villa | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2008 | |
Sammerraiee Villa | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2008 | |
Dr.Awaddallah Villa | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2007 | |
TAJ Mall – Abdoun | APFC, BC, Building, MCC, MDB, MP, SMDB, ST | General Electric SEN Plus Type Test Withdrawable Main Distribution Boards. Submain Distribution Boards. Motor Control Centers Form 4 |
Haddadin Engineering & Construction Co. | January 6, 2007 | |
Greater Amman Water SCADA Project (GASS) | Contracting, Distributed Control System, Hot Redundant Configuration, Pumping Station, SCADA & Automation, UHF | Owner : Water Authority of Jordan. Location : Greater Amman Geographic Area. Commissioning date : 2010 Project value : 3.4 Million JD. BRIEF DESCRIPTION OF THE WORKS The objective of this Contract is to implement an integrated SCADA system that will en |
Water Authority of Jordan | January 6, 2007 | |
Capital Bank | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2006 | |
Villa Lina Nuqul | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2006 | |
Salem Villa | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2006 | |
Zubi Villa | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2006 | |
As Samra Waste Water Treatment Plant – Ain Ghazal Pretreatment | Distributed Control System, Hot Redundant Configuration, MCC, MDB, Waste Water Treatment Plant (WWTP) | Owner : Ministry of Water & Irrigation/ Water Authority of Jordan. Location : Ain Ghazal Commissioning date : Macrh 2006 Project value : 179,000 JD Contractor : Joint Venture of M/S The Morganti Group Inc. and M/S Infilco Degremont Inc. A- INTRODU |
Water Authority of Jordan | January 6, 2006 | |
Mujib & Southern Ghor Irrigation Project Stage II Contract D | APFC, ATS, ATST, Control System, MDB, MV, Pumping Station, SMDB | Owner : Jordan Valley Authority. Location : Mujib. Commissioning date : 2003/2004 Project value : Around 9 Million JD. Project description: Mujib contract-D consists of one upstream reservoir, two downstream reservoirs and one pumping station close to |
Jordan Valley Authority | January 6, 2006 | |
Marina Town Hotel- Tala Bay- Aqaba | FDB, Hotel, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2005 | |
Al Refaai Villa | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2005 | |
Expansion Of Aqaba Waste Water Facilities | APFC, ATS, GPRS, MCC, MDB, SMDB, Waste Water Treatment Plant (WWTP) | Owner : Water Authority of Jordan. Location : Aqaba Commissioning date : 2004/2005 Project value : Around 30 Million USD (USAID Financed) Project description: The main aim of the project is to rehabilitate the existing Waste Water Treatment Plant in Aq |
Aqaba Water Company | January 6, 2005 | |
Audi Bank- Mecca Mall | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2004 | |
Union Tobacco Expansion | FDB, Factory, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2004 | |
AMC-100 | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2003 | |
Royal Palace P-511 | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2003 | |
Wadi Ma’in, Zara & Mujib Water Treatment & Conveyance System | MCC, MV, Pumping Station | Water Authority of Jordan | January 6, 2003 | ||
Amman Water Project- C2 | MV, Pumping Station | Supply of: 7No. 6.6KV FVNR pump starters |
Water Authority of Jordan | January 6, 2003 | |
Burkush Villa- Ajloun | Building, FDB, MCC, MDB, SMDB | Supply of all Low Voltage Switchgear Panels to Project. Share this entryShare on FacebookShare on XShare on LinkedInShare by Mail |
Ammoun Maint. & Cont. Co. | June 1, 2002 | |
The Royal Palace (Jordan) P500 | Building, FDB, MCC, MDB, SMDB, SYNC | Supply of all Low Voltage Switchgear Panels to Project and including a synchronizing panel with load shedding. |
Ammoun Maint. & Cont. Co. | June 1, 2002 | |
Deir Alla – Zai Water Expansion Project | Contracting, Waste Water Treatment Plant (WWTP) | Supply of: Installation and Commissioning of ABB supplied systems: 33/6.6KV transformers. 6.6KV Switchgear. 6.6KV RVNR reactor starters |
Water Authority of Jordan | January 6, 2002 | |
Lajjoun Wells Water Project- Damkhi, Swaqa, Qastal & Qatraneh | Control System, MCC, MDB, Pumping Station, UHF | Owner : Water Authority of Jordan. Location : Qatraneh to Qastal. Commissioning date : 2002/ 2003. Project value : Around 7.5 Million JD. Project description: The project activities are: To build a new pumping station in the village of Damkhi (75 km fo |
Water Authority of Jordan | January 6, 2002 | |
Prince Hamzah Hospital | FORM 2, FORM 4, Hospital, MCC, MDB, SMDB | Main Distribution Boards Form 4 Automatic Transfer Switch Synchronizing Panel Sub-main Distribution Boards Form 2 Motor Control Centers |
Hussein Atieh & Sons Company | August 19, 2001 | |
Kafrein Water Supply Project | APFC, Control System, Distributed Control System, MCC, MDB, SMDB, Waste Water Treatment Plant (WWTP) | Owner : Water Authority of Jordan. Location : Kafrein (Dead Sea road 15 Km to Dead Sea). Commissioning date : 2001/ 2002. Project value : Around 3.5 Million JD (USAID & WAJ Co-Financed). Project description: The main aim is to supply fresh water to |
Water Authority of Jordan | January 6, 2001 | |
Wadi Arab Waste Water Treatment Plant | APFC, ATS, Distributed Control System, FDB, Fiber Optic, MCC, MDB, MIMIC, MV, SMDB, SYNC, Waste Water Treatment Plant (WWTP) | Owner : Water Authority of Jordan. Consultant : JV DAR & RRI (Germany) in associations with SIGMA (Jordan) Location : Doqara village / Irbid district. Commissioning date : 1999/ 2000. |
Water Authority of Jordan | January 6, 1999 | |
Jordan University for Science and Technology- Power Generation Station Upgrading | Industrial, MV | Supply of: Synchronizing of 3 x 11KV generators and feeders’ management Complete MV distribution scheme including 11KV switchgear, power transformers, ring-main-units and 11KV emergency power distribution station complete with synchronizing equipment ( |
Jordan University of Science and Technology JUST | January 6, 1998 | |
Sheraton Hotel (Amman Jordan) | APFC, Hotel, MCC, MDB, SMDB | Owner : M/S Al Tanmiyah for Trade & Tourism Consultant : Buro Happold Consulting Engineers London Contractor : Arab Construction & Contracting Company. Location : Amman. Commissioning date : August, 1999. Project value : JD 50 Million. Project |
Al Tanmiyah for Trade & Tourism | January 6, 1998 | |
LIBB Pumping Station | APFC, MCC, MDB, Pumping Station, SMDB | 5 Pumps, 1100KW, 400VAC each, starting method is Auto-transformer starters. 5 Power transformers, 2000KVA, 33/0.4 kV each, with 3200A, 4Pole incoming withdrawable ACB’s. 2 Diesel generating sets, 1600KVA, 1200KW, 400V, 50Hz /each. 3 Low voltage Main distribution and starter panels (Auto-transformer starters). 1 Automatic synchronizing panel for the stand-by emergency generators. 1 PLC based remote control and mimic panel with power management and provision for Telemetry interface. 1 Hydraulic surge protection system. 1 Electromagnetic Flow-meter, ND 800. 1 Chlorination system. Set of Ultra – sonic level transmitters, Pressure transmitters and flow transmitters. |
Water Authority of Jordan | January 5, 1997 | |
Al-Keena Hygienic Paper Mill | APFC, ATS, Contracting, Distributed Control System, FDB, Factory, MCC, MDB, MV, SMDB | Owner : Nuqul group. Location : East Irenbeh (South of Queen Alia International Airport). Commissioning date : 1995/ 1996. Project value : USD 33 million. Project Description: Production of Hygienic paper in multi-ply rolls from raw pulp material. Equi |
Nuqul Group | January 6, 1995 | |
National Chlorine Industry (NCI) | Factory, MCC, MDB, MV | Owner : National Chlorine Company. Location : Al-Mowaqar, 30km from Amman. Commissioning date : December, 1994. Project value : JD 14 million. Project Description: Production of liquid chlorine and other products. Equipment and scope: SF6 MV substation |
National Chlorine Company (NCI) | January 5, 1993 | |
Zarka Grand Flour Mill Co. | Control System, Factory, MCC | Zarka Grand Flour Mill Co. | December 30, 1992 | ||
Wadi Essir WWTP | Control System, MCC, Waste Water Treatment Plant (WWTP) | This first Fully Automated Waste Water Treatment Plant in Jordan. Executed in early 1990s |
Main Contractor | December 28, 1992 | |
Dar Al-Dawa Jordan | APFC, Factory, MCC, MDB, SMDB, SYNC | Jundi Electrical Industry – Part of TECO Group Supplied the Main Distribution Board for Dar Al-Dawa Supply of Main Distribution Board and 4-Genset Synchronizing Panel |
Dar Al-Dawa | July 11, 1985 |