Image Project Name Categories Description End Client Year
2020 Super Doll Panel APFC, FDB, FORM 2, FORM 4, Factory, MDB, News, Projects, SMDB

Jundi Electrical Industry part of TECO Group won the supply

BURHANI POWERENGINEERS LTD 2020
Feeder Pillar Project FORM 2, MCC, News

Jundi Electrical Industry part of TECO Group won the supply

Free Engineering Co. F.E.C 2020
The Royal Palace (Jordan) P500 – Special DB Panel FDB, FORM 2, News

Supply of All Distribution Boards Main Distribution Boards Form4 Submain

The Royal Palace (Jordan) 2020
Extension of National Center for Diabetes – MCC Panels FORM 2, Hospital, MCC, News, VFD

Supply of All Distribution Boards Main Distribution Boards Form4 Submain

Anas Anani & Partners Co. 2020
Libya Starter Panels FORM 2, MCC, News

Jundi Electrical Industry part of TECO Group won the supply

Free Engineering Co. F.E.C 2019
Vegetable Market – WM Building, FDB, FORM 2, MCC, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

International New Technical Est. 2019
3 PV plants project FORM 2, Factory, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

Associated Transtech Contracting - ASTRACO 2019
JUST Computer Lab – Irbid Building, FDB, FORM 2, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

Imkan Contracting Company 2019
JUST Nano Technology – Irbid Building, FDB, FORM 2, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

Imkan Contracting Company 2019
RFQ 36-2019 – ATS 800ِA Panel ATS, Building, FORM 2, MDB, News

Jundi Electrical Industry part of TECO Group won the supply

Arab Bank - HQ 2019
Ghabawi Fridge FORM 2, Factory, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

E-Jaz Contracting Co. 2019
Warheads Manufacturing Building FDB, FORM 2, Factory, MCC, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

Anas Anani & Partners Contracting Co. 2019
Wadi Mousa Central City Development Building, FDB, FORM 2, MCC, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

International New Technical Est. 2019
Radiotherapy Center FDB, FORM 2, Hospital, MCC, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

Mohammad Ahmad Abu Eisha & Brothers Contracting Company 2019
ATS Panels Package ATS, Building, FORM 2, News

Supply of ATS 2500A 4P ACB Type Drawout. Breakers are from

Free Engineering Co. F.E.C 2019
RFQ 265-2018 – ATS and MDB Panels ATS, Building, FORM 2, MDB, News

Jundi Electrical Industry part of TECO Group won the supply

Arab Bank - HQ 2019
JUST Veterinary Hospital – Irbid FDB, FORM 2, FORM 4, Hospital, MCC, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

INDUSTRIAL JORDAN RAWABI 2019
Ministry Finance Complex APFC, Building, FDB, FORM 2, FORM 4, MCC, MDB, News

Jundi Electrical Industry part of TECO Group won the supply

Derar Saraireh & Sons for Engineering & Contracting 2019
Sync and MDB Panel FORM 2, Factory, Industrial, MDB, News, SYNC

Supply of Lighting Control Panel According to client’s requirements All

Al Jazy Trading 2018
PLC Panel and Automation Consultation Services for Uranium Pilot Plant Project Contracting, Control System, FORM 2, Factory, News

Supply of PLC cabinet for Area 100 called PLC-100 and

JORDANIAN URANIUM MINING COMPANY (JUMCO) 2018
MCC Panel Building, FORM 2, MCC, News

Supply of Sub-Main Distribution Board for Hotel According to client’s

Arab bank - Amman 2018
DB panel requirement in Arab Potash Company FORM 2, Factory, Industrial, MCC, News

Supply for a special distribution board for Megha Engineering &

Megha Engineering & Infrastructures Ltd. 2018
SMDB Panel for Crown Plaza Amman FORM 2, Hotel, News, SMDB

Supply of Sub-Main Distribution Board for Hotel According to client’s

Crown Plaza Amman 2018
Lighting Panel for kiln substation FORM 2, Factory, News, SMDB

Supply of Lighting Control Panel According to client’s requirements All

Manaseer - Modern Cement & Mining Co. 2018
APC Wireless Rehabilitation Contracting, Control System, Factory, Wireless Microwave

Emergency rehabilitation of wireless system which was supplied by TECO

Arab Potash Company (APC) 2017
RFQ 2017-4103 Electrical panel for shredder machine FORM 2, Factory, News, ST

Supply of Motor Control Center (MCC) Two soft starters 75KW

Manaseer - Modern Cement & Mining Co. 2017
Prince Hamzah Rehabilitation Project Contracting, Control System, FORM 4, Factory, Hospital, MDB, News

Jundi Electrical Industry part of TECO Group has been awarded

Ministry of Health 2017
Mas Factory Electical Panels APFC, FORM 2, Factory, MDB, News

Supply of Distribution Boards Main Distribution Board Form 2. Automatic

Mas Factory 2017
Al-Kindi Hospital APFC, FDB, FORM 2, FORM 4, Hospital, MCC, MDB, News, SMDB

Jundi Electrical Industry part of TECO Group won the supply

Hiba Engineering Company 2017
Supply and Installation of ATS 250A ATS, Contracting, FORM 2, News

Supply and Installation of Automatic Transfer Switch 250A (ATS 250A)

Abdul Hameed Shoman Foundation 2017
School Project Building, FORM 2, MCC, MDB, MP, News

Supply of Distribution Boards Main Distribution Board Form 2. External

Al Laith Enginering and Contracting Co. 2017
Jordan House RHC Metering Devices Control System, Distributed Control System, News, SCADA & Automation

Jundi Electrical Industry part of TECO Group wins a supply

The Hashimite Royal Court 2017
LV Panels Building, FORM 2, MCC

Supply of MCC Panel according to clients requirements All Breakers

Smart Works Design Works 2017
CONSTRUCTION OF 2500 MT SRC CEMENT STEEL SILO FOR LINE-2 Control System, Distributed Control System, FORM 4, Factory, MCC, News, SCADA & Automation

Jundi Electrical Industry part of TECO Group wins a supply

Al-Ghanem Trading & Cont. Co. Ltd. 2017
APC REPLACEMENT OF FIREFIGHTING PUMPS AND FIRE MAIN AT HLP AREA Control System, FDB, FORM 2, Factory, Fiber Optic, MCC, MDB, News, SCADA & Automation, SMDB

Supply of MDB, SMDB, Lighting Panel, PLC RTU with Fiber Optic

Elaf Contracting Co. 2017
Airport FreeZone WWTP – ATS Panel ATS, FORM 2, News, Waste Water Treatment Plant (WWTP)

Supply of ATS 2500A 4P ACB Type Drawout. Breakers are from

Free Engineering Co. F.E.C 2017
Biosphere – Electric Panels FORM 2, Factory, MCC, SMDB

Supply of Main, Sub-Main and MCC Panels for Factory According

Imad Jundi & Partners Co. 2017
Downtown Palace of Justice APFC, Building, FDB, FORM 2, MCC, MDB, News, SMDB

Supply of All Distribution Boards Main Distribution Boards Form2 Submain

Hiba Engineering Company 2017
SESAME XAFS beam-line Power Panel and Cable Tray Contracting, FORM 2, Factory, News, SMDB

Complete Contracting Job including the following: 1- Cable Tray supplied

SESAME 2016
Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 42-2016 ATST, News, Projects, Pumping Station

6 Autotransformer standalone starters during November-2016 of 60KW range to

Water Authority of Jordan 2016
Arab Mining Company and Arab Mining industrial development institute Building, FDB, FORM 2, FORM 4, MCC, MDB, News, SMDB

Supply of All Distribution Boards Main Distribution Boards Form4 Type

Derar Saraireh & Sons for Engineering & Contracting 2016
Miyahuna Autotransformer Starter Panels Tender O-T-16-0011-ZARQA ATST, News, Pumping Station

20 Autotransformer standalone starters were awarded to TECO Group – Jundi

Miyahuna Water Company LLC. 2016
SESAME Storage Ring and RF Electrical Distribution Infrastructure Contracting, FDB, FORM 2, FORM 4, Factory, MDB, News, SMDB

Complete Contracting Job including the following: 1- Cable Tray supplied

SESAME (Synchrotron-light for Experimental Science and Applications in the Middle East) 2016
Modern Eyes Hospital Amman FDB, Hospital, MCC, MDB, News, SMDB

Supply of All Distribution Boards Type Tested Main Distribution Boards

Anas Anani & Partners Co. 2016
Extension of National Center for Diabetes FDB, FORM 2, FORM 4, Hospital, MCC, MDB, News, SMDB

Supply of All Distribution Boards Main Distribution Boards Form4 Submain

Anas Anani & Partners Co. 2016
THE JUDICIAL INSTITUTE OF JORDAN Building, FDB, FORM 2, MCC, MDB, News, SMDB

Supply of All Distribution Boards Main Distribution Boards Form2 Sub-main

Anas Anani & Partners Co. 2016
Expansion of Iman Hospital – Ajloun FDB, Hospital, MCC, MDB, News, SMDB

Supply of All Distribution Boards Main Distribution Boards Form4 Submain

Al-Muhandes Contracting Co 2016
King Hussien Cancer Center (KHCC) BC, FDB, Hospital, MDB, News, SMDB, VFD

All low voltage switchgear for King Hussien Cancer Center (KHCC

Joint Venture Consolidated Contractors Group SAL Offshore CCC And Haddadin Engineering Co. For Contracting. 2016
Lighting Panels Al Quisemah Stadium Rehabilitation Commercial, MCC, News, Projects

Supply of All Distribution Boards Main Distribution Boards Form2 Advanced

AlEdwan Contracting Company 2016
Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 12-2015 ATST, News, Projects, Pumping Station

49 Autotransformer standalone starters during November-2015 ranging from 30KW to

Water Authority of Jordan 2015
Crown Plaza Amman Hotel, MCC, News, SMDB

Supply of All Distribution Boards Main Distribution Boards Form2 Submain

Imad Jundi & Partners Co. 2015
PLASCO LV Switchgear APFC, Factory, MCC, News, Projects, SYNC

Supply Low voltage Switchgear Schneider Components and RITTAL Enclosures Ri4Power

BURHANI POWERENGINEERS LTD 2015
King Abdullah Gardenz PK2 and Zone1 and 2 Commercial, Control System, MCC, MDB

Supply of All Distribution Boards Main Distribution Boards Form4 Submain

Aldaleel Electromechanical Contracting EST. 2014
Iraq Hospital APFC, ATS, BC, Commercial, Hospital, LV, MCC, MDB, Projects, SMDB, ST, Switchgear

Supply 3 Major Hospitals in IRAQ (Al Qaem, Heet, Haditha)

Epsilon Engineering Company 2014
Wadi Shallala Irbid WWTP Control System, Distributed Control System, Fiber Optic, MIMIC, Waste Water Treatment Plant (WWTP)

Municipal waste water treatment plant, Wadi Shallalah, Jordan Capacity: 164,000

Passavant Roediger GmbH 2014
Miyahuna – Rehabilitation of Muwaggar PS and Wells TENDER C-T-11-0043 Contracting, Distributed Control System, GPRS, Pumping Station, SCADA & Automation

Owner : Miyahuna Water Company Location : Muwaggar , Jordan

Miyahuna Water Company LLC. 2014
Automatic Power Factor Correction Panels APFC

Supply of branded Automatic Power Factor Correction Quantity 9 with

Global Power Solutions 2013
Basrah Sport City – IRAQ Commercial, MV

Supply of: 11kV Medium Voltage Switchgear GE PowerVAC (28 Cubicles)

Abdullah Owayez Hammood Al-Juboori 2013
Queen Alia International Airport Access Control Panels Commercial, MCC

Supply of Access Control Panels & Accessories

Johnson Controls 2012
Autotransformer Starters ATST, Pumping Station

Supply of: 23 No. of Autotransformer Starter Panels up to

Water Authority of Jordan 2012
Autotransformer Starter Panel 550KW ATST, Pumping Station

Supply of 550KW Autotransformer Starter Panel. Click to enlarge Share

Yarmouk Water Co. L.L.C. 2011
Spinneys TAJ Mall Branch APFC, ATS, Building, MCC, MDB, SMDB

Supply of All Distribution Boards Main Distribution Boards Form2 Submain

Ahmad Badaweih Est. 2011
Canadian Embassy (Jordan) APFC, Building, MCC, MDB, SMDB

Supply of: Low Voltage Switchgear Submain Distribution Boards Motor Control

Jordan Electro Mechanical EST.(JEME) 2011
600KVAr Automatic Power Factor Correction APFC, Commercial, Projects

Supply of 4 No. 600KVAr Automatic Power Factor Correction Panels

WESTPOINT HOME BAHRAIN W.L.L. 2011
SOFTY Chemical Manufacturing Plant FDB, Factory, MCC, MDB, SMDB

Supply of: Main Distribution Boards. Submain Distrubution Boards. Motor Control

United Electromechanical International 2011
Public Security Department Head Quarters (PSD) APFC, Building, FDB, LV, MCC, MDB, SMDB

Supply of: Main Distribution Boards (MDBs) Type Schneider Electric Prisma

DURRAT AL QASEM CONTRACTING CO. 2011
Arab Potash Company (APC) Plant Optimization and Production Expansion Solar Ponds Contracting, Distributed Control System, Factory, Wireless Microwave

Owner : Arab Potash Company Location : Ghor Safi Commissioning

Arab Potash Company 2011
Supply of Autotransformer Starter Panels ATST, Pumping Station

Supply of 13No. Autotransformer Starter Panels of various sizes. Share

Miyahuna Water Company LLC. 2010
Syringe Modern Factory APFC, FDB, Factory, MCC, MDB, SMDB

Supply of All Distribution Boards Main Distribution Boards Form4 Submain

ALPHA Refregeration and Conditioning Est. 2010
Black Iris Ship Synchronizing Panel Industrial, Projects, SYNC

Supply of: Generator Synchronizing Panel (3 Gensets)

Jordan Tractor & Equipment Co. 2010
Alrai Press Building, MCC, MDB, SMDB

Supply of: Main Distribution Boards. Submain Distrubution Boards. Motor Control

Al-Muhandes Contracting Co 2010
Expansion of Karak Hospital Hospital, MCC, MDB, SMDB

Supply: Main Distribution Boards Submain Distribution Boards Motor Control Centers

DURRAT AL QASEM CONTRACTING CO. 2010
Housing and Urban Development WWTP Control System, MCC, Waste Water Treatment Plant (WWTP)

5  Compact Water Treatment Plants Project MAIN DISTRIBUTION BOARDS MOTOR

Aqua Treat 2010
Muwaggar Waste Water Treatment Plant (WWTP) Control System, Distributed Control System, Fiber Optic, MCC, MDB, SMDB, VFD, Waste Water Treatment Plant (WWTP)

Supply of: Main Distribution Boards Submain Distribution Motor Control Centers

Ali Zoubi Sons Contracting CO. 2010
4 Star Hotel Aqaba – DoubleTree By Hilton APFC, Hotel, MCC, MDB, SMDB

Supply of All Distribution Boards Main Distribution Boards Form4 Submain

Kildani Engineering & Contracting (KEC) 2009
JORDAN TELEVISION BUILDING-AQABA Building, MCC, MDB, SMDB

Supply of All Distribution Boards Main Distribution Boards Form2 Submain

Abdel Rahman Al Abweh 2009
Expansion of Jordan University of Science & Technology APFC, Building, MCC, MDB, SMDB

Supply of: Main Distribution Boards Submain Distribution Boards Motor Control

Ahmad Badaweih Est. 2009
33/11 kV Substation Metering Systems (NEPCO) Industrial, MP

Supply of: Supply of  Computrized Tariff Metering Systems for New

Tareq Technical Engineering Co. 2009
Hussari Villa Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2008
Sammerraiee Villa Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2008
Dr.Awaddallah Villa Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2007
TAJ Mall – Abdoun APFC, BC, Building, MCC, MDB, MP, SMDB, ST

Supply of: General Electric SEN Plus Type Test Withdrawable  Main

Haddadin Engineering & Construction Co. 2007
Greater Amman Water SCADA Project (GASS) Contracting, Distributed Control System, Hot Redundant Configuration, Pumping Station, SCADA & Automation, UHF

Owner : Water Authority of Jordan. Location : Greater Amman

Water Authority of Jordan 2007
Capital Bank Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2006
Villa Lina Nuqul Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2006
Salem Villa Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2006
Zubi Villa Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2006
As Samra Waste Water Treatment Plant – Ain Ghazal Pretreatment Distributed Control System, Hot Redundant Configuration, MCC, MDB, Waste Water Treatment Plant (WWTP)

Owner : Ministry of Water & Irrigation/ Water Authority of

Water Authority of Jordan 2006
Mujib & Southern Ghor Irrigation Project Stage II Contract D APFC, ATS, ATST, Control System, MDB, MV, Pumping Station, SMDB

Owner : Jordan Valley Authority. Location : Mujib. Commissioning date

Jordan Valley Authority 2006
Marina Town Hotel- Tala Bay- Aqaba FDB, Hotel, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2005
Al Refaai Villa Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2005
Expansion Of Aqaba Waste Water Facilities APFC, ATS, GPRS, MCC, MDB, SMDB, Waste Water Treatment Plant (WWTP)

Owner : Water Authority of Jordan. Location : Aqaba Commissioning

Aqaba Water Company 2005
Audi Bank- Mecca Mall Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2004
Union Tobacco Expansion FDB, Factory, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2004
AMC-100 Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2003
Royal Palace P-511 Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2003
Wadi Ma’in, Zara & Mujib Water Treatment & Conveyance System MCC, MV, Pumping Station Water Authority of Jordan 2003
Amman Water Project- C2 MV, Pumping Station

Supply of: 7No. 6.6KV FVNR pump starters

Water Authority of Jordan 2003
Burkush Villa- Ajloun Building, FDB, MCC, MDB, SMDB

Supply of all Low Voltage Switchgear Panels to Project. Share

Ammoun Maint. & Cont. Co. 2002
The Royal Palace (Jordan) P500 Building, FDB, MCC, MDB, SMDB, SYNC

Supply of all Low Voltage Switchgear Panels to Project and

Ammoun Maint. & Cont. Co. 2002
Deir Alla – Zai Water Expansion Project Contracting, Waste Water Treatment Plant (WWTP)

Supply of: Installation and Commissioning of ABB supplied systems: 33/6.6KV

Water Authority of Jordan 2002
Lajjoun Wells Water Project- Damkhi, Swaqa, Qastal & Qatraneh Control System, MCC, MDB, Pumping Station, UHF

Owner : Water Authority of Jordan. Location : Qatraneh to

Water Authority of Jordan 2002
Kafrein Water Supply Project APFC, Control System, Distributed Control System, MCC, MDB, SMDB, Waste Water Treatment Plant (WWTP)

Owner : Water Authority of Jordan. Location : Kafrein (Dead

Water Authority of Jordan 2001
Wadi Arab Waste Water Treatment Plant APFC, ATS, Distributed Control System, FDB, Fiber Optic, MCC, MDB, MIMIC, MV, SMDB, SYNC, Waste Water Treatment Plant (WWTP)

Owner : Water Authority of Jordan. Consultant : JV DAR

Water Authority of Jordan 1999
Jordan University for Science and Technology- Power Generation Station Upgrading Industrial, MV

Supply of: Synchronizing of 3 x 11KV generators and feeders’

Jordan University of Science and Technology JUST 1998
Sheraton Hotel (Amman Jordan) APFC, Hotel, MCC, MDB, SMDB

Owner : M/S Al Tanmiyah for Trade & Tourism Consultant

Al Tanmiyah for Trade & Tourism 1998
LIBB Pumping Station APFC, MCC, MDB, Pumping Station, SMDB

Owner : Water Authority of Jordan. Location : Libb village

Water Authority of Jordan 1997
Al-Keena Hygienic Paper Mill APFC, ATS, Contracting, Distributed Control System, FDB, Factory, MCC, MDB, MV, SMDB

Owner : Nuqul group. Location : East Irenbeh (South of

Nuqul Group 1995
National Chlorine Industry (NCI) Factory, MCC, MDB, MV

Owner : National Chlorine Company. Location : Al-Mowaqar, 30km from

National Chlorine Company (NCI) 1993
Zarka Grand Flour Mill Co. Control System, Factory, MCC Zarka Grand Flour Mill Co. 1992
Wadi Essir WWTP Control System, MCC, Waste Water Treatment Plant (WWTP)

This first Fully Automated Waste Water Treatment Plant in Jordan.

Main Contractor 1992