TECO GROUP is a Jordan-based electrical engineering company established in 1981 by Mr. Adnan Jundi, specialising in the design, manufacturing, testing, supply, installation, commissioning, and maintenance of low and medium voltage switchgear, SCADA and automation systems, and industrial communication networks. From our factory and headquarters in Amman’s Marka Industrial Area, we have delivered hundreds of projects across Jordan, East Africa, Iraq, and the wider Middle East — serving hospitals, international hotels, factories, water pumping stations, and wastewater treatment plants.
Our company at a glance:
- Established in 1981 — over four decades of continuous operation in electrical engineering and panel manufacturing.
- Authorized Siemens System Integrator since 2001 — designing and commissioning PLC-based SCADA and DCS systems on the Siemens platform.
- Authorized panel builder with certified partnerships with leading international manufacturers for switchgear enclosures, breakers, and control components.
- Own design and production facility in Amman — fully equipped with state-of-the-art machinery, Eplan CAE, AutoCAD, and a dedicated testing laboratory.
- Strict quality assurance programme with 100% factory testing on every panel manufactured.
- Experienced team of engineers and technicians capable of delivering simple traditional systems through to highly sophisticated distributed control systems and hot redundant SCADA configurations.
What we do:
- Products — MDB, SMDB, MCC, ATS, APFC, FDB, metering panels, medium voltage switchgear up to 33 KV, and generator synchronising systems up to 11 KV.
- SCADA and Automation — DCS, PLC control systems, process MIMIC, hot redundant configurations, and TECO SCADA Software.
- Industrial Communication — fiber optic, wireless microwave, mobile GPRS, and UHF radio telemetry networks.
- Services — electrical testing up to 40 KV, thermal imaging, primary injection testing, consultation, and operation & maintenance.
- Jundi Contracting Company (JCC) — our contracting division for full electrical installation and commissioning works.
Our clients and project track record:
- Water Authority of Jordan (WAJ) — hundreds of autotransformer starter panels across multiple government tenders.
- Miyahuna — SCADA and telemetry for pumping stations and well rehabilitation.
- Greater Amman Water SCADA System (GASS) — city-wide UHF telemetry with hot redundant servers.
- As Samra WWTP, Wadi Arab WWTP, Wadi Shallala WWTP, Muwaggar WWTP — full plant DCS and switchgear.
- Arab Potash Company (APC) — wireless microwave DCS and factory automation.
- King Hussein Cancer Center (KHCC) — type tested MDB and MCC.
- DoubleTree by Hilton Aqaba, Sheraton Hotel Amman, Crown Plaza Amman — complete hotel LV switchgear.
- Iraq Hospitals — MDB, MCC, and power factor correction for international healthcare.
- View our complete reference list and project portfolio.







