Some of the great achievements

Tender 3-SUPPLY-GIZ-2020 - Supply of Starter Panels

tender of 3-SUPPLY-GIZ-2020 to supply 17 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan.
2020

Super Doll Panel

Feeder Pillar Project

Libya Starter Panels

3 PV plants project

JUST Nano Technology - Irbid

Main Distribution Boards Form 2 Sub-main Distribution Boards Form 2 Final Distribution Boards

Ghabawi Fridge

ATS Panels Package

JUST Veterinary Hospital - Irbid

Main Distribution Boards Form 4 Sub-main Distribution Boards Form 2 Motor Control Centers Final Distribution Boards

Ministry Finance Complex

Main Distribution Boards Form 4 Sub-main Distribution Boards Form 2 Motor Control Centers Final Distribution Boards Automatic Power Factor Correction Panel

MCC Panel

Supply of Motor Control Center for Bank According to client's requirements All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL

Al-Kindi Hospital

Main Distribution Boards Form-4b Automatic Power Factor Correction Boards Sub-main Distribution Boards Form-2b Motor Control Centers Final Distribution Boards

School Project

Arab Mining Company and Arab Mining industrial development institute

Main Distribution Boards Form4 Type Prisma P Submain Distribution Boards Form2 Final Distribution Boards that are connected to Building Management System (BMS) Motor Control Center that are connected to Building Management System (BMS)

Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 12-2015

49 Autotransformer standalone starters during November-2015 ranging from 30KW to 250KW to Water Authority of Jordan. Schneider Electric Components along with RITTAL enclosures combined for a superior quality product.

Iraq Hospital

Wadi Shallala Irbid WWTP

TAJ Mall - Abdoun

General Electric SEN Plus Type Test Withdrawable  Main Distribution Boards. Submain Distribution Boards. Motor Control Centers Form 4

The Royal Palace (Jordan) P500

Supply of all Low Voltage Switchgear Panels to Project and including a synchronizing panel with load shedding.

Prince Hamzah Hospital

Main Distribution Boards Form 4 Automatic Transfer Switch Synchronizing Panel Sub-main Distribution Boards Form 2 Motor Control Centers

Wadi Arab Waste Water Treatment Plant

Owner : Water Authority of Jordan. Consultant : JV DAR & RRI (Germany) in associations with SIGMA (Jordan) Location : Doqara village / Irbid district. Commissioning date : 1999/ 2000.

LIBB Pumping Station

5 Pumps, 1100KW, 400VAC each, starting method is Auto-transformer starters. 5 Power transformers, 2000KVA, 33/0.4 kV each, with 3200A, 4Pole incoming withdrawable ACB’s. 2 Diesel generating sets, 1600KVA, 1200KW, 400V, 50Hz /each. 3 Low voltage Main distribution and starter panels (Auto-transformer starters). 1 Automatic synchronizing panel for the stand-by emergency generators. 1 PLC based remote control and mimic panel with power management and provision for Telemetry interface. 1 Hydraulic surge protection system. 1 Electromagnetic Flow-meter, ND 800. 1 Chlorination system. Set of Ultra – sonic level transmitters, Pressure transmitters and flow transmitters.

Dar Al-Dawa Jordan

Jundi Electrical Industry - Part of TECO Group Supplied the Main Distribution Board for Dar Al-Dawa Supply of Main Distribution Board and 4-Genset Synchronizing Panel