The biggest and most complex Waste Water Treatment Plant (WWTP) in Jordan
Municipal wastewater treatment plant
Capacity: 164,000 PE / 22,289 m³/d

Planning, design, supply and commissioning of all electrical equipment and SCADA system of a biological wastewater treatment plant with sludge treatment. Treatment process: Storm water overflow basins; screening system; aerated grit and grease chamber; primary treatment; aeration tank; secondary clarifier, mechanical sludge thickening and dewatering; gas treatment/utilization; energy generation by CHP.

The great minds of TECO Engineers worked together to produce a robust DCS system that is built on Siemens WinCC 6.2 and completely executed in 2014.

This page is specifically dedicated to demonstrate the capability of Jundi Electrical Industry Part of TECO Group.

Client: Passavant-Roediger GmbH

Consultant: Fitchner Consulting Engineers

Click here to go to project main page and more details

SCADA System Screen Shots

PLC Cabinets Pictures

MIMIC Panel Pictures