
Some of the great achievements

Brigade – 60 – Zarqa – Second Shipment
Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Brigade - 60 - Zarqa Project to Dirar Saraireh Engineering & Contracting Company
Second Batch of Panels were ready for delivery on 10.05.2025

LOCAL CONTROL PANEL
Jundi Electrical Industry part of TECO Group was awarded the supply of LOCAL CONTROL PANEL Panel for pumping project. The client is Free Engineering Co. F.E.C
Panels were ready for delivery on 06.05.2025
Second Part was ready for delivery on 10.05.2025

PANELS
Jundi Electrical Industry part of TECO Group was awarded the supply of SMDB and LCP Panel for pumping project. The client is Free Engineering Co. F.E.C
Panels were ready for delivery on 03.05.2025

Movenpick SPA
Jundi Electrical Industry part of TECO Group was awarded the supply of SMDB and FDB Panels for project named Movenpick to Ahmad Badaweih Est.
Panels were ready for delivery on 07.04.2025

Aqaba University of Technology
Jundi Electrical Industry part of TECO Group was awarded the supply of MDB-Court Panel to Al-Aqaba for Medical Co.
Panels were ready for delivery on 24.03.2025

SoftStarter Panel 75KW
Jundi Electrical Industry part of TECO Group was awarded the supply of SOFT STARTER 75KW Panel to Muhammad Ali Al-Qawouk Company
Panels were ready for delivery on 05-02-2025

Autotransformer Panel 110KW
Jundi Electrical Industry part of TECO Group was awarded the supply of ATST 110KW to Miyahuna Water Company.
Panels were ready for delivery on 30.12.2024

Aqaba port silos
Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Aqaba port silos Project to Mohamed Al-Aidi & Sons Co. Ltd.
Panels were ready for delivery on 18.01.2024

Brigade – 60 – Zarqa
Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Brigade - 60 - Zarqa Project to Dirar Saraireh Engineering & Contracting Company
First Batch of Panels were ready for delivery on 09.01.2024
Second Batch of Panels were ready for delivery on 10.05.2025 and can be seen on this link

KFAB RETROFIT STUDENT HOUSING
Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for KFAB RETROFIT STUDENT HOUSING Project to The Morganti Group, Inc.
Panels were ready for delivery on 27.12.2023

Autotransformer Panel 110KW
Jundi Electrical Industry part of TECO Group was awarded the supply of ATST 110KW to Miyahuna Water Company.
Panels were ready for delivery on 18.10.2023

SIB – Zanbaka Branch
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to SIB - Zanbaka Branch for TANFEEZ.MEP Contractor.
Panels were ready for delivery on 26.10.2023

Marj School
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Marj School for Ismail Al Hersh Company for Contracting.
Panels were ready for delivery on 17.09.2023

Proposed Megapipes Weholite Factory
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Proposed Megapipes Weholite Factory for BURHANI POWERENGINEERS LTD.
Panels were ready for delivery on 28.05.2023

LV Panel
Jundi Electrical Industry part of TECO Group was awarded the supply of for a SMDB Panel
Panels were ready for delivery on 29.05.2023

Commercial Building Rehabilitation
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels for a commercial building rehabilitation.
Panels were ready for delivery on 27.02.2023

Saroo Villa
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Saroo Villa PROJECT for Mr. MOATH YOUSEF JABER.
Panels were ready for delivery on 17.01.2023

KILOMBERO K4 EXPANSION PROJECT
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to KILOMBERO K4 EXPANSION PROJECT for BURHANI POWERENGINEERS LTD
Panels were ready for delivery on 10.12.2022

Marine Infantry Battalion
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Marine Infantry Battalion for Mohamed Al-Aidi & Sons Co. Ltd.
Panels were ready for delivery on 10.12.2022

Ajloun Classrooms Building
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Ajloun Classrooms Building for Ismail Al Hersh Company for Contracting.
Panels were ready for delivery on 05.11.2022

Fire Fighter Building – Aqaba
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Fire Fighter Building - Aqaba for Ismail Al Hersh Company for Contracting.
Panels were ready for delivery on 22.10.22

Aqaba Health Center
Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Aqaba Health Center for Ismail Al Hersh Company for Contracting.
Panels were ready for delivery on 22.10.22

MDB Panel – The Bishops School for Boys
Jundi Electrical Industry part of TECO Group was awarded the supply of MDB Panel for The Bishops School for Boys.
Panel was ready for delivery on 15.08.22

Electrical panel – Jordan Petroleum Refinery Co. LTD
Jundi Electrical Industry part of TECO Group was awarded the supply of Special MCC Panel for Modern Jordanian For Industrial Supplies for Jordan Petroleum Refinery Co. LTD
Panel was ready for delivery on 08.08.22

Waste Water Treatment Plant In Shidia Mines
Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, PLCs, and DB Panels for a private contractor for Waste Water Treatment Plant In Shidia Mines
All panels were ready for delivery on 20.05.2022

Waste Water Treatment Plant In Shidia Mines – SCADA Overview
Waste Water Treatment Plant In Shidia Mines
Planning, design, supply and commissioning of all electrical equipment and SCADA system of a biological wastewater treatment plant with sludge treatment.
The great minds of TECO Engineers worked together to produce an Advanced SCADA system that is built on Siemens WinCC Advanced and completely executed in 2022.

Baoon School Ajloun
Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for INDUSTRIAL JORDAN RAWABI for Baoon School Project in Ajloun (Saudi Grant Fund)
All panels were ready for delivery on 19.05.22
3D Model for all panels is included.

Tabarbour School
Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for Reef Contracting for Tabarbour School Project
All panels were ready for delivery on 21.02.20

Military Establishment Warehouses Khaw
Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Abd Al Rahman Al Abweh Contracting Company for Military Establishment Warehouses in Khaw.
All panels were ready for delivery on 14.02.2022

USAID Schools Project
Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Dirar Saraireh Engineering & Contracting Company for 3 USAID Schools named:

Um Batamah Girls School
Jundi Electrical Industry part of TECO Group won the supply of MDB Panel related to Project Um Batamah Girls School for Shabab Contracting Company.
Panel was ready for delivery on 03-08-2021

Airforce Base Project
Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Ismail Al Hersh Company for Contracting Company related to the Jordanian Airforce Project.
All Panels were ready for delivery on 02.08.2021

SMDB AC
Jundi Electrical Industry part of TECO Group won the supply of two SMDB AC Panels for Arab Bank - Head Quarters Amman

MCC Panel
Jundi Electrical Industry part of TECO Group won the supply of MCC Panel for a cash customer

Combined ATS Panel for 4 Electric Meters
all panels related to Project named Combined ATS Panel for 4 Electric Meters for United Nations Office for the Coordination of Humanitarian Affairs (OCHA),Amman

SMDB Panel
Jundi Electrical Industry part of TECO Group won the supply of an MDB Panel for related to a project name SMDB Panel for The International Centre for Synchrotron-light for Expremental Science and Applications in the Middle East (SESAME)

Private Villa MDB Panel
Jundi Electrical Industry part of TECO Group won the supply of an MDB Panel for related to a project name Private Villa for client Al-Dasoqi trading company

LV Panels
supply of all panels to Engineering and Maintenace Group.

Sama Sarhan School
all panels related to Project named Sama Sarhan School

Ministry of Finance – MCC Panels
Completion of fifth batch for the LV Switchgear (MCC Panels) related to TECO Project No. 17082/TC named Ministry of Finance Complex (MOF).

Fine VFD Panel
fabrication works for 3x75KW and 1x22KW VFD Panel for M/S F.A. Kettaneh and end client is Fine Hygenic Holding Company.

Tender 9-2020 – Supply of Starter Panels
Tender of 9-2020 to supply 73 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan.

KARAMEH BORDER X-Ray Station
Supply of all panels related to Project named KARAMEH BORDER X-Ray Station

ChangeOver ATS 125A 4P
Supply of Automatic Transfer Swtich ChangeOver Type 125A 4P

ATS 60A CONTACTOR TYPE
supply of 2 x Automatic Transfer Swtich 60A CONTACTOR Type with Bypass

Tender 3-SUPPLY-GIZ-2020 – Supply of Starter Panels
tender of 3-SUPPLY-GIZ-2020 to supply 17 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan.
https://tecogrp.com/wp-content/uploads/1157-420938406-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-06-21 13:24:072020-07-03 17:03:08ATST 90KW – Autotransformer Panel
https://tecogrp.com/wp-content/uploads/138-855074791-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-06-20 17:18:382020-07-03 17:14:16G1 Modified Factory – Qatar
https://tecogrp.com/wp-content/uploads/1128-736763303-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-06-11 09:23:072020-06-11 09:23:09Intercontinental Panels Rehabilitation
2020
https://tecogrp.com/wp-content/uploads/1129-653729598-e1583754469155.jpg
300
400
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-03-09 08:38:212020-04-18 14:49:12Super Doll Panel
https://tecogrp.com/wp-content/uploads/1310-977638777-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-01-29 12:24:242020-02-20 16:04:28Feeder Pillar Project
https://tecogrp.com/wp-content/uploads/733-363502974.jpg
1536
2048
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-01-14 08:43:352020-01-18 07:11:06Process of Copper Fabrication and Installation for Power Switchgear
https://tecogrp.com/wp-content/uploads/1632-328993549-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-01-08 15:10:032020-02-22 14:32:24The Royal Palace (Jordan) P500 – Special DB Panel
https://tecogrp.com/wp-content/uploads/1114-675638011-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2020-01-05 13:17:472020-03-13 15:20:38Extension of National Center for Diabetes – MCC Panels
https://tecogrp.com/wp-content/uploads/IMG_20191228_121118_resized_20191228_123222993.jpg
1488
1984
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-12-29 15:29:492020-01-18 07:20:34Tafila Pumping Station – SCADA Overview
https://tecogrp.com/wp-content/uploads/IMG_20191228_115552_resized_20191228_123226064.jpg
1984
1488
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-12-28 10:50:142020-01-01 07:28:47First Schneider Electric Prisma Plus in Jordan
https://tecogrp.com/wp-content/uploads/Picture-100-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-12-27 15:57:542022-05-16 13:29:43Schneider Electric TTA – Prisma Plus Panels
Rehabilitation of Muwaggar PS and Wells – SCADA Overview
This project included interface works with Greater Amman SCADA System (GASS) Project which was executed originally by Telvent & Jundi Electrical Industry Joint Venture more than a decade ago. S7-1200 PLCs, WinCC Flexible, OPC Server for GPRS were all integrated together in this project.

APC Expansion and Optimization Solar Ponds – SCADA Overview
In this project, TECO employed a new SCADA System for controlling the Booster Pumps and their associated Seal Water Pump. Wireless System is employed all over the Solar Ponds including harvesters.
https://tecogrp.com/wp-content/uploads/2-page-0-scaled.jpg
1978
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-12-16 11:55:172021-06-26 10:28:05Wadi Shallaleh Water Treatment Pant – SCADA Overview
https://tecogrp.com/wp-content/uploads/1055-593412531-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-11-20 11:45:012020-01-02 14:39:02Libya Starter Panels
https://tecogrp.com/wp-content/uploads/1455-620226142.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-10-30 13:25:502022-05-16 13:32:133 PV plants project – Batch#2 – Jordan Hospital PV Project
https://tecogrp.com/wp-content/uploads/1528-229840619-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-10-20 14:17:272022-05-16 13:32:48Ministry Finance Complex – LV Switchgear BATCH #4
https://tecogrp.com/wp-content/uploads/1331-422360596.jpg
477
1032
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-10-17 10:31:362020-03-13 16:17:31Vegetable Market – WM
https://tecogrp.com/wp-content/uploads/1144-680315733.jpg
1280
960
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-09-05 10:12:142020-01-03 09:03:053 PV plants project
https://tecogrp.com/wp-content/uploads/136-629310607-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-09-01 10:41:472020-03-13 16:17:44JUST Computer Lab – Irbid
JUST Nano Technology – Irbid
Main Distribution Boards Form 2
Sub-main Distribution Boards Form 2
Final Distribution Boards
https://tecogrp.com/wp-content/uploads/1538-192117356.jpg
768
1024
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-08-01 14:01:192019-08-01 14:24:18Ministry Finance Complex – LV Switchgear BATCH #3
https://tecogrp.com/wp-content/uploads/1114-205313007-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-06-25 13:49:302020-01-02 14:38:12RFQ 36-2019 – ATS 800ِA Panel
https://tecogrp.com/wp-content/uploads/1014-780950496.jpg
1040
780
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-06-01 11:32:312020-03-13 16:18:04Ghabawi Fridge
https://tecogrp.com/wp-content/uploads/928-649004381.jpg
780
1040
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-06-01 11:26:002022-05-16 13:35:48Warheads Manufacturing Building
https://tecogrp.com/wp-content/uploads/1558-49772092-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-05-14 10:49:112022-05-16 13:36:20Wadi Mousa Central City Development
https://tecogrp.com/wp-content/uploads/1019-377396951-1.jpg
1280
720
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-04-22 14:00:312020-03-13 15:46:28Radiotherapy Center
https://tecogrp.com/wp-content/uploads/2143-710942818.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-04-18 08:33:252020-01-02 14:37:31ATS Panels Package
https://tecogrp.com/wp-content/uploads/JADARA-Terminator.png
540
480
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-04-18 07:45:212019-04-18 07:45:21Warheads Manufacturing Building
https://tecogrp.com/wp-content/uploads/1255-278366436.jpg
1280
960
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2019-02-11 15:07:032020-01-02 14:36:53RFQ 265-2018 – ATS and MDB Panels
JUST Veterinary Hospital – Irbid
Main Distribution Boards Form 4
Sub-main Distribution Boards Form 2
Motor Control Centers
Final Distribution Boards

Ministry Finance Complex
Main Distribution Boards Form 4
Sub-main Distribution Boards Form 2
Motor Control Centers
Final Distribution Boards
Automatic Power Factor Correction Panel
https://tecogrp.com/wp-content/uploads/202-53939952.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2018-08-22 18:29:352020-01-12 18:36:53Automatic Power Correction Panels for Al-Kindi Hospital Project
https://tecogrp.com/wp-content/uploads/945-575052229.jpg
774
1032
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2018-08-14 13:55:382020-03-13 16:18:46Sync and MDB Panel
https://tecogrp.com/wp-content/uploads/3057741-120292498-1.jpg
634
960
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2018-08-14 12:56:342019-04-22 13:46:01Radiotherapy Center
https://tecogrp.com/wp-content/uploads/1328-471235631.jpg
1280
960
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2018-05-21 10:02:092020-01-03 09:07:33PLC Panel and Automation Consultation Services for Uranium Pilot Plant Project
MCC Panel
Supply of Motor Control Center for Bank
According to client's requirements
All breakers and components are supplied from M/S Schneider Electric world wide.
Cabinets are from M/S RITTAL
https://tecogrp.com/wp-content/uploads/1317-673282470.jpg
1280
720
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2018-05-16 07:13:312021-12-07 20:00:08DB panel requirement in Arab Potash Company
https://tecogrp.com/wp-content/uploads/1018-226965116.jpg
1280
960
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2018-02-04 12:18:332020-01-07 17:13:33SMDB Panel for Crown Plaza Amman
https://tecogrp.com/wp-content/uploads/858-110424098.jpg
768
1024
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2018-02-04 12:08:362020-03-15 08:41:52Lighting Panel for kiln substation
https://tecogrp.com/wp-content/uploads/169-347212156-scaled.jpg
2560
1440
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-12-17 10:34:122020-01-02 14:44:24APC Wireless Rehabilitation
https://tecogrp.com/wp-content/uploads/1135-703637382.jpg
1280
960
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-12-13 09:48:282017-12-13 09:48:28RFQ 2017-4103 Electrical panel for shredder machine
https://tecogrp.com/wp-content/uploads/737-121975955-scaled.jpg
1440
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-11-18 08:00:292020-01-02 14:43:29Prince Hamzah Rehabilitation Project
https://tecogrp.com/wp-content/uploads/1440-834419933.jpg
1040
780
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-11-01 15:10:462020-03-13 16:19:04Mas Factory Electical Panels
Al-Kindi Hospital
Main Distribution Boards Form-4b
Automatic Power Factor Correction Boards
Sub-main Distribution Boards Form-2b
Motor Control Centers
Final Distribution Boards
https://tecogrp.com/wp-content/uploads/ATS-250A-Picture-Cut.jpg
583
494
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-08-21 09:37:362020-01-02 14:36:12Supply and Installation of ATS 250A
https://tecogrp.com/wp-content/uploads/1817-63500713.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-04-22 07:52:202017-04-22 07:52:20School Project
https://tecogrp.com/wp-content/uploads/PM2120.jpg
160
160
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-04-20 06:37:412017-04-20 06:37:41Jordan House RHC Metering Devices
https://tecogrp.com/wp-content/uploads/1442-494208859.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-04-05 10:14:332018-05-21 10:14:58LV Panels
https://tecogrp.com/wp-content/uploads/1115-789339823-scaled.jpg
1440
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-03-29 08:02:392020-01-01 07:32:29CONSTRUCTION OF 2500 MT SRC CEMENT STEEL SILO FOR LINE-2
https://tecogrp.com/wp-content/uploads/IMG_9497-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-03-26 11:58:212019-12-13 16:16:54APC REPLACEMENT OF FIREFIGHTING PUMPS AND FIRE MAIN AT HLP AREA
https://tecogrp.com/wp-content/uploads/2253-313484024-1.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-02-02 08:09:032020-03-13 16:19:27Airport FreeZone WWTP – ATS Panel
https://tecogrp.com/wp-content/uploads/033-880443560.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2017-01-27 10:23:222020-01-02 14:34:00Biosphere – Electric Panels
Downtown Palace of Justice
Supply of All Distribution Boards
Main Distribution Boards Form2
Submain Distribution Boards Form2
Final Distribution Boards
Motor Control Center
https://tecogrp.com/wp-content/uploads/1623-727926625-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-12-20 15:12:012020-07-02 17:12:57SESAME XAFS beam-line Power Panel and Cable Tray
https://tecogrp.com/wp-content/uploads/1439-774982885-1.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-10-29 07:47:462022-05-16 13:44:26Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 42-2016
Arab Mining Company and Arab Mining industrial development institute
Main Distribution Boards Form4 Type Prisma P
Submain Distribution Boards Form2
Final Distribution Boards that are connected to Building Management System (BMS)
Motor Control Center that are connected to Building Management System (BMS)
https://tecogrp.com/wp-content/uploads/1255-430368657-scaled.jpg
1440
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-08-30 19:28:332020-01-02 14:29:53Miyahuna Autotransformer Starter Panels Tender O-T-16-0011-ZARQA
https://tecogrp.com/wp-content/uploads/1623-727926625-scaled.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-05-01 19:19:472022-05-16 13:46:35SESAME Storage Ring and RF Electrical Distribution Infrastructure
https://tecogrp.com/wp-content/uploads/913-293335152.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-05-01 17:37:572020-07-02 19:02:07Modern Eyes Hospital Amman
https://tecogrp.com/wp-content/uploads/1054-162753354-1.jpg
960
1280
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-04-13 09:32:122020-03-13 15:23:04Extension of National Center for Diabetes
https://tecogrp.com/wp-content/uploads/1836-99406280.jpg
780
1040
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-04-13 09:27:552022-05-16 13:47:28THE JUDICIAL INSTITUTE OF JORDAN
https://tecogrp.com/wp-content/uploads/Iman-Hospital-Start-of-Project.jpg
350
450
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-04-13 09:03:492016-06-01 07:10:17Expansion of Iman Hospital – Ajloun
https://tecogrp.com/wp-content/uploads/KHCC2.jpg
1536
2048
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-04-12 19:25:332020-07-03 17:20:15King Hussien Cancer Center (KHCC)
https://tecogrp.com/wp-content/uploads/1543-690783400.jpg
1536
2048
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2016-04-01 14:25:572020-03-15 08:44:07Lighting Panels Al Quisemah Stadium Rehabilitation
Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 12-2015
49 Autotransformer standalone starters during November-2015 ranging from 30KW to 250KW to Water Authority of Jordan.
Schneider Electric Components along with RITTAL enclosures combined for a superior quality product.
https://tecogrp.com/wp-content/uploads/25-007.jpg
1536
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2015-04-13 14:31:482020-01-12 09:49:58Crown Plaza Amman
https://tecogrp.com/wp-content/uploads/iraq-hospitals-4.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2014-01-06 20:18:302022-05-16 13:50:55Iraq Hospital
https://tecogrp.com/wp-content/uploads/WSFeaturedImage.jpg
530
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2014-01-06 20:15:392020-07-02 18:47:53Wadi Shallala Irbid WWTP
https://tecogrp.com/wp-content/uploads/Muwaggar-PS-and-Wells-1.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2014-01-06 20:12:392020-01-01 07:36:24Miyahuna – Rehabilitation of Muwaggar PS and Wells TENDER C-T-11-0043
https://tecogrp.com/wp-content/uploads/APFC2.jpg
480
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2013-06-01 08:24:392020-01-02 14:41:09Automatic Power Factor Correction Panels
Basrah Sport City – IRAQ
11kV Medium Voltage Switchgear GE PowerVAC (28 Cubicles)
11kV Indoor Load Interrupt Fused Switches (Qty 12)
11kV Outdoor Pad Mounted Interrupt Fused Switches (Qty 22)
Spare Parts for above
https://tecogrp.com/wp-content/uploads/qaia.jpg
480
640
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2012-01-06 19:58:262016-06-01 08:09:21Queen Alia International Airport Access Control Panels
Autotransformer Starters
Supply of:
23 No. of Autotransformer Starter Panels up to 250kW
https://tecogrp.com/wp-content/uploads/DSC00227.jpg
2048
1536
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2011-04-13 14:10:002021-12-14 12:57:54Spinneys TAJ Mall Branch
https://tecogrp.com/wp-content/uploads/canadian-embassy-3.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2011-01-06 20:04:472022-05-16 13:52:55Canadian Embassy (Jordan)
https://tecogrp.com/wp-content/uploads/600KVAr-1.jpg
640
480
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2011-01-06 19:39:022020-01-02 14:40:15600KVAr Automatic Power Factor Correction
https://tecogrp.com/wp-content/uploads/softy-3.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2011-01-06 19:35:112022-05-16 13:53:21SOFTY Chemical Manufacturing Plant
https://tecogrp.com/wp-content/uploads/Picture-033-scaled.jpg
1920
2560
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2011-01-06 19:09:152022-05-16 13:54:03Public Security Department Head Quarters (PSD)
https://tecogrp.com/wp-content/uploads/APC-Plant-Optimization-18.jpg
540
720
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2011-01-06 18:44:222022-05-16 13:54:30Arab Potash Company (APC) Plant Optimization and Production Expansion Solar Ponds
https://tecogrp.com/wp-content/uploads/IMAG0016.jpg
2560
1920
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2010-04-13 14:21:402020-01-02 14:32:29Syringe Modern Factory
https://tecogrp.com/wp-content/uploads/black-iris-1.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2010-01-06 20:01:392020-01-03 08:53:39Black Iris Ship Synchronizing Panel
Alrai Press
Supply of:
Main Distribution Boards.
Submain Distrubution Boards.
Motor Control Centers.
https://tecogrp.com/wp-content/uploads/karak-hospital-8.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2010-01-06 19:23:062022-05-16 13:55:58Expansion of Karak Hospital
https://tecogrp.com/wp-content/uploads/houing-urban-development-1.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2010-01-06 19:01:432020-01-01 07:38:52Housing and Urban Development WWTP
https://tecogrp.com/wp-content/uploads/muwaggar-water-treatment-plant-8.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2010-01-06 18:50:352022-05-16 13:56:32Muwaggar Waste Water Treatment Plant (WWTP)
https://tecogrp.com/wp-content/uploads/hiltonaqaba.jpg
380
677
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2009-04-15 18:11:422020-01-07 17:18:144 Star Hotel Aqaba – DoubleTree By Hilton
https://tecogrp.com/wp-content/uploads/just2-1.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2009-01-06 19:47:232016-06-01 08:14:05Expansion of Jordan University of Science & Technology
TAJ Mall – Abdoun
General Electric SEN Plus Type Test Withdrawable Main Distribution Boards.
Submain Distribution Boards.
Motor Control Centers Form 4
https://tecogrp.com/wp-content/uploads/sa2.jpg
338
500
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2007-01-06 18:21:222020-01-01 07:40:00Greater Amman Water SCADA Project (GASS)
https://tecogrp.com/wp-content/uploads/mujib-lv-mcc.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2006-01-06 15:34:592020-01-01 07:40:36Mujib & Southern Ghor Irrigation Project Stage II Contract D
https://tecogrp.com/wp-content/uploads/marina-town.jpeg
166
303
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2005-06-01 09:40:032020-01-07 17:16:29Marina Town Hotel- Tala Bay- Aqaba
https://tecogrp.com/wp-content/uploads/aqaba-wwtp-350x245.gif
245
350
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2005-01-06 18:19:012020-01-01 07:41:13Expansion Of Aqaba Waste Water Facilities
https://tecogrp.com/wp-content/uploads/Wadi-Ma’in-1.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2003-01-06 18:33:312020-01-01 07:41:56Wadi Ma’in, Zara & Mujib Water Treatment & Conveyance System
The Royal Palace (Jordan) P500
Supply of all Low Voltage Switchgear Panels to Project and including a synchronizing panel with load shedding.
https://tecogrp.com/wp-content/uploads/Lajjoun-Wells-Water-Project-1.jpg
480
640
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2002-01-06 15:40:032020-08-22 08:26:06Lajjoun Wells Water Project- Damkhi, Swaqa, Qastal & Qatraneh
Prince Hamzah Hospital
Main Distribution Boards Form 4
Automatic Transfer Switch
Synchronizing Panel
Sub-main Distribution Boards Form 2
Motor Control Centers
https://tecogrp.com/wp-content/uploads/kafrein-water-supply-1.jpg
600
450
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin2001-01-06 12:10:302021-12-11 18:46:23Kafrein Water Supply Project
Wadi Arab Waste Water Treatment Plant
Owner : Water Authority of Jordan.
Consultant : JV DAR & RRI (Germany) in associations with SIGMA (Jordan)
Location : Doqara village / Irbid district.
Commissioning date : 1999/ 2000.
https://tecogrp.com/wp-content/uploads/just-1.jpg
591
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin1998-01-06 12:00:432020-01-03 08:57:38Jordan University for Science and Technology- Power Generation Station Upgrading
https://tecogrp.com/wp-content/uploads/sheraton-3.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin1998-01-06 11:21:032020-07-11 12:49:22Sheraton Hotel (Amman Jordan)
LIBB Pumping Station
5 Pumps, 1100KW, 400VAC each, starting method is Auto-transformer starters.
5 Power transformers, 2000KVA, 33/0.4 kV each, with 3200A, 4Pole incoming withdrawable ACB’s.
2 Diesel generating sets, 1600KVA, 1200KW, 400V, 50Hz /each.
3 Low voltage Main distribution and starter panels (Auto-transformer starters).
1 Automatic synchronizing panel for the stand-by emergency generators.
1 PLC based remote control and mimic panel with power management and provision for Telemetry interface.
1 Hydraulic surge protection system.
1 Electromagnetic Flow-meter, ND 800.
1 Chlorination system.
Set of Ultra – sonic level transmitters, Pressure transmitters and flow transmitters.
https://tecogrp.com/wp-content/uploads/Al-keena-1.jpg
600
800
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin1995-01-06 11:06:092020-01-03 08:59:39Al-Keena Hygienic Paper Mill
https://tecogrp.com/wp-content/uploads/IMG_20191228_120525_resized_20191228_123223995.jpg
1488
1984
admin
https://tecogrp.com/wp-content/uploads/logo.png
admin1992-12-28 11:37:352020-01-01 07:43:38Wadi Essir WWTP
Dar Al-Dawa Jordan
Jundi Electrical Industry - Part of TECO Group Supplied the Main Distribution Board for Dar Al-Dawa Supply of Main Distribution Board and 4-Genset Synchronizing Panel
Share this entry
Post Views: 775








