Some of the great achievements

Aqaba port silos

Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Aqaba port silos Project to Mohamed Al-Aidi & Sons Co. Ltd. Panels were ready for delivery on 18.01.2024

Brigade – 60 – Zarqa

Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Brigade - 60 - Zarqa Project to Dirar Saraireh Engineering & Contracting Company First Batch of Panels were ready for delivery on 09.01.2024

KFAB RETROFIT STUDENT HOUSING

Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for KFAB RETROFIT STUDENT HOUSING Project to The Morganti Group, Inc. Panels were ready for delivery on 27.12.2023

Autotransformer Panel 110KW

Jundi Electrical Industry part of TECO Group was awarded the supply of ATST 110KW to Miyahuna Water Company. Panels were ready for delivery on 18.10.2023

SIB – Zanbaka Branch

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to SIB - Zanbaka Branch for TANFEEZ.MEP Contractor. Panels were ready for delivery on 26.10.2023

Marj School

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Marj School for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 17.09.2023

Proposed Megapipes Weholite Factory

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Proposed Megapipes Weholite Factory for BURHANI POWERENGINEERS LTD. Panels were ready for delivery on 28.05.2023

LV Panel

Jundi Electrical Industry part of TECO Group was awarded the supply of  for a SMDB Panel Panels were ready for delivery on 29.05.2023

Commercial Building Rehabilitation

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels for a commercial building rehabilitation. Panels were ready for delivery on 27.02.2023

Saroo Villa

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Saroo Villa PROJECT for Mr. MOATH YOUSEF JABER.  Panels were ready for delivery on 17.01.2023

KILOMBERO K4 EXPANSION PROJECT

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to KILOMBERO K4 EXPANSION PROJECT for BURHANI POWERENGINEERS LTD Panels were ready for delivery on 10.12.2022

Marine Infantry Battalion

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Marine Infantry Battalion for Mohamed Al-Aidi & Sons Co. Ltd. Panels were ready for delivery on 10.12.2022

Ajloun Classrooms Building

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Ajloun Classrooms Building for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 05.11.2022

Fire Fighter Building – Aqaba

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Fire Fighter Building - Aqaba for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 22.10.22

Aqaba Health Center

Jundi Electrical Industry part of TECO Group was awarded the supply of all electrical panels to Aqaba Health Center for Ismail Al Hersh Company for Contracting. Panels were ready for delivery on 22.10.22

MDB Panel – The Bishops School for Boys

Jundi Electrical Industry part of TECO Group was awarded the supply of MDB Panel for The Bishops School for Boys. Panel was ready for delivery on 15.08.22

Electrical panel – Jordan Petroleum Refinery Co. LTD

Jundi Electrical Industry part of TECO Group was awarded the supply of Special MCC Panel for Modern Jordanian For Industrial Supplies for Jordan Petroleum Refinery Co. LTD Panel was ready for delivery on 08.08.22

Waste Water Treatment Plant In Shidia Mines

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, PLCs, and DB Panels for a private contractor for Waste Water Treatment Plant In Shidia Mines All panels were ready for delivery on 20.05.2022

Waste Water Treatment Plant In Shidia Mines – SCADA Overview

Waste Water Treatment Plant In Shidia Mines Planning, design, supply and commissioning of all electrical equipment and SCADA system of a biological wastewater treatment plant with sludge treatment. The great minds of TECO Engineers worked together to produce an Advanced SCADA system that is built on Siemens WinCC Advanced and completely executed in 2022.

Baoon School Ajloun

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for INDUSTRIAL JORDAN RAWABI for Baoon School Project in Ajloun (Saudi Grant Fund) All panels were ready for delivery on 19.05.22 3D Model for all panels is included.

Tabarbour School

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for Reef Contracting for Tabarbour School Project All panels were ready for delivery on 21.02.20

Military Establishment Warehouses Khaw

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Abd Al Rahman Al Abweh Contracting Company for Military Establishment Warehouses in Khaw. All panels were ready for delivery on 14.02.2022

USAID Schools Project

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Dirar Saraireh Engineering & Contracting Company for 3 USAID Schools named:

Um Batamah Girls School

Jundi Electrical Industry part of TECO Group won the supply of MDB Panel related to Project Um Batamah Girls School for Shabab Contracting Company. Panel was ready for delivery on 03-08-2021

Airforce Base Project

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Ismail Al Hersh Company for Contracting Company related to the Jordanian Airforce Project. All Panels were ready for delivery on 02.08.2021

SMDB AC

Jundi Electrical Industry part of TECO Group won the supply of two SMDB AC Panels for Arab Bank - Head Quarters Amman

MCC Panel

Jundi Electrical Industry part of TECO Group won the supply of MCC Panel for a cash customer

Combined ATS Panel for 4 Electric Meters

all panels related to Project named Combined ATS Panel for 4 Electric Meters for United Nations Office for the Coordination of Humanitarian Affairs (OCHA),Amman

SMDB Panel

Jundi Electrical Industry part of TECO Group won the supply of an MDB Panel for related to a project name SMDB Panel for The International Centre for Synchrotron-light for Expremental Science and Applications in the Middle East (SESAME)

Private Villa MDB Panel

Jundi Electrical Industry part of TECO Group won the supply of an MDB Panel for related to a project name Private Villa for client Al-Dasoqi trading company

LV Panels

supply of all panels to Engineering and Maintenace Group.

Sama Sarhan School

all panels related to Project named Sama Sarhan School

Ministry of Finance – MCC Panels

Completion of fifth batch for the LV Switchgear (MCC Panels) related to TECO Project No. 17082/TC named Ministry of Finance Complex (MOF).

Fine VFD Panel

fabrication works for 3x75KW and 1x22KW VFD Panel for M/S F.A. Kettaneh and end client is Fine Hygenic Holding Company.

Tender 9-2020 – Supply of Starter Panels

Tender of 9-2020 to supply 73 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan.

KARAMEH BORDER X-Ray Station

Supply of all panels related to Project named KARAMEH BORDER X-Ray Station

ChangeOver ATS 125A 4P

Supply of Automatic Transfer Swtich ChangeOver Type 125A 4P

ATS 60A CONTACTOR TYPE

supply of 2 x Automatic Transfer Swtich 60A CONTACTOR Type with Bypass

Tender 3-SUPPLY-GIZ-2020 – Supply of Starter Panels

tender of 3-SUPPLY-GIZ-2020 to supply 17 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan.
2020

Super Doll Panel

Feeder Pillar Project

Rehabilitation of Muwaggar PS and Wells – SCADA Overview

This project included interface works with Greater Amman SCADA System (GASS) Project which was executed originally by Telvent & Jundi Electrical Industry Joint Venture more than a decade ago. S7-1200 PLCs, WinCC Flexible, OPC Server for GPRS were all integrated together in this project.

APC Expansion and Optimization Solar Ponds – SCADA Overview

In this project, TECO employed a new SCADA System for controlling the Booster Pumps and their associated Seal Water Pump. Wireless System is employed all over the Solar Ponds including harvesters.

Libya Starter Panels

3 PV plants project

JUST Nano Technology – Irbid

Main Distribution Boards Form 2 Sub-main Distribution Boards Form 2 Final Distribution Boards

Ghabawi Fridge

ATS Panels Package

JUST Veterinary Hospital – Irbid

Main Distribution Boards Form 4 Sub-main Distribution Boards Form 2 Motor Control Centers Final Distribution Boards

Ministry Finance Complex

Main Distribution Boards Form 4 Sub-main Distribution Boards Form 2 Motor Control Centers Final Distribution Boards Automatic Power Factor Correction Panel

MCC Panel

Supply of Motor Control Center for Bank According to client's requirements All breakers and components are supplied from M/S Schneider Electric world wide. Cabinets are from M/S RITTAL

Al-Kindi Hospital

Main Distribution Boards Form-4b Automatic Power Factor Correction Boards Sub-main Distribution Boards Form-2b Motor Control Centers Final Distribution Boards

School Project

Downtown Palace of Justice

Supply of All Distribution Boards Main Distribution Boards Form2 Submain Distribution Boards Form2 Final Distribution Boards Motor Control Center

Arab Mining Company and Arab Mining industrial development institute

Main Distribution Boards Form4 Type Prisma P Submain Distribution Boards Form2 Final Distribution Boards that are connected to Building Management System (BMS) Motor Control Center that are connected to Building Management System (BMS)

Water Authority of Jordan (WAJ) Autotransformer Starter Panels Tender 12-2015

49 Autotransformer standalone starters during November-2015 ranging from 30KW to 250KW to Water Authority of Jordan. Schneider Electric Components along with RITTAL enclosures combined for a superior quality product.

Iraq Hospital

Wadi Shallala Irbid WWTP

Basrah Sport City – IRAQ

11kV Medium Voltage Switchgear GE PowerVAC (28 Cubicles) 11kV Indoor Load Interrupt Fused Switches (Qty 12) 11kV Outdoor Pad Mounted Interrupt Fused Switches (Qty 22) Spare Parts for above

Autotransformer Starters

Supply of: 23 No. of Autotransformer Starter Panels up to 250kW

Alrai Press

Supply of: Main Distribution Boards. Submain Distrubution Boards. Motor Control Centers.

TAJ Mall – Abdoun

General Electric SEN Plus Type Test Withdrawable  Main Distribution Boards. Submain Distribution Boards. Motor Control Centers Form 4

The Royal Palace (Jordan) P500

Supply of all Low Voltage Switchgear Panels to Project and including a synchronizing panel with load shedding.

Prince Hamzah Hospital

Main Distribution Boards Form 4 Automatic Transfer Switch Synchronizing Panel Sub-main Distribution Boards Form 2 Motor Control Centers

Wadi Arab Waste Water Treatment Plant

Owner : Water Authority of Jordan. Consultant : JV DAR & RRI (Germany) in associations with SIGMA (Jordan) Location : Doqara village / Irbid district. Commissioning date : 1999/ 2000.

LIBB Pumping Station

5 Pumps, 1100KW, 400VAC each, starting method is Auto-transformer starters. 5 Power transformers, 2000KVA, 33/0.4 kV each, with 3200A, 4Pole incoming withdrawable ACB’s. 2 Diesel generating sets, 1600KVA, 1200KW, 400V, 50Hz /each. 3 Low voltage Main distribution and starter panels (Auto-transformer starters). 1 Automatic synchronizing panel for the stand-by emergency generators. 1 PLC based remote control and mimic panel with power management and provision for Telemetry interface. 1 Hydraulic surge protection system. 1 Electromagnetic Flow-meter, ND 800. 1 Chlorination system. Set of Ultra – sonic level transmitters, Pressure transmitters and flow transmitters.

Dar Al-Dawa Jordan

Jundi Electrical Industry - Part of TECO Group Supplied the Main Distribution Board for Dar Al-Dawa Supply of Main Distribution Board and 4-Genset Synchronizing Panel