Posts
The Royal Palace (Jordan) P500
Supply of all Low Voltage Switchgear Panels to Project and including a synchronizing panel with load shedding.
Prince Hamzah Hospital
Main Distribution Boards Form 4
Automatic Transfer Switch
Synchronizing Panel
Sub-main Distribution Boards Form 2
Motor Control Centers
Wadi Arab Waste Water Treatment Plant
Owner : Water Authority of Jordan.
Consultant : JV DAR & RRI (Germany) in associations with SIGMA (Jordan)
Location : Doqara village / Irbid district.
Commissioning date : 1999/ 2000.
LIBB Pumping Station
5 Pumps, 1100KW, 400VAC each, starting method is Auto-transformer starters.
5 Power transformers, 2000KVA, 33/0.4 kV each, with 3200A, 4Pole incoming withdrawable ACB’s.
2 Diesel generating sets, 1600KVA, 1200KW, 400V, 50Hz /each.
3 Low voltage Main distribution and starter panels (Auto-transformer starters).
1 Automatic synchronizing panel for the stand-by emergency generators.
1 PLC based remote control and mimic panel with power management and provision for Telemetry interface.
1 Hydraulic surge protection system.
1 Electromagnetic Flow-meter, ND 800.
1 Chlorination system.
Set of Ultra – sonic level transmitters, Pressure transmitters and flow transmitters.