Entries by admin

Baoon School Ajloun

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for INDUSTRIAL JORDAN RAWABI for Baoon School Project in Ajloun (Saudi Grant Fund)

All panels were ready for delivery on 19.05.22

3D Model for all panels is included.

Tabarbour School

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs, MCCs, and DB Panels for Reef Contracting for Tabarbour School Project

All panels were ready for delivery on 21.02.20

Military Establishment Warehouses Khaw

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Abd Al Rahman Al Abweh Contracting Company for Military Establishment Warehouses in Khaw.

All panels were ready for delivery on 14.02.2022

Motorized Change Over ATS 400A Special Offer

AUTOMATIC TRANSFER SWITCH (ATS)

ELECTRICAL RATING: 400 A
TYPE: MOTORIZED CHANGE OVER SWITCH MECHANICALLY INTERLOCKED, OPEN TRANSITION
NO. OF POLES: 4
MODES OF OPERATION: HAND, OFF, AUTO
PROTECTION:
TRANSFORMER: VOLTAGE UNBALANCE, OVER VOLTAGE, UNDER VOLTAGE, PAHSE ROTATION, PHASE FAILURE
GENERATOR: VOLTAGE UNBALANCE, OVER VOLTAGE, UNDER VOLTAGE, PAHSE ROTATION, PHASE FAILURE
SIGNALLING:
TRANSFORMER VOLTAGE AVAILABLE (T.V.A) GREEN LAMP
GENERATOR VOLTAGE AVAILABLE (G.V.A) GREEN LAMP
LOAD ON TRANSFORMER (L.O.T) GREEN LAMP
LOAD ON GENERATOR (L.O.G) GREEN LAMP
ENCLOSURE IP RATING: 55
CABLE ENTRY:
TRANSFORMER: BOTTOM ENTRY
GENERATOR: BOTTOM ENTRY
LOAD: BOTTOM AND TOP
STANDARD: IEC 439-1

USAID Schools Project

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Dirar Saraireh Engineering & Contracting Company for 3 USAID Schools named:

Um Batamah Girls School

Jundi Electrical Industry part of TECO Group won the supply of MDB Panel related to Project Um Batamah Girls School for Shabab Contracting Company.

Panel was ready for delivery on 03-08-2021

Airforce Base Project

Jundi Electrical Industry part of TECO Group won the supply of MDBs, SMDBs and MCC Panels for Ismail Al Hersh Company for Contracting Company related to the Jordanian Airforce Project.

All Panels were ready for delivery on 02.08.2021