Waste Water Treatment Plant In Shidia Mines
Planning, design, supply and commissioning of all electrical equipment and SCADA system of a biological wastewater treatment plant with sludge treatment.
The great minds of TECO Engineers worked together to produce an Advanced SCADA system that is built on Siemens WinCC Advanced and completely executed in 2022.
This page is specifically dedicated to demonstrate the capability of Jundi Electrical Industry Part of TECO Group.
Consultant: Madi and Partners Consulting Engineers