In June 2017 TECO Group HQ Building was equipped with Solar Power in order to improve the building efficiency and power loses. Additionally, the building is now equipped with BMS System that is completely monitored and logged.
In June 2017 TECO Group HQ Building was equipped with Solar Power in order to improve the building efficiency and power loses. Additionally, the building is now equipped with BMS System that is completely monitored and logged.