3D Panel Design Evolution
TECO GROUP continuous development of Panel Design have led to the introduction of 3D Panel Design inline with Industry 4.0 evolution.
TECO GROUP continuous development of Panel Design have led to the introduction of 3D Panel Design inline with Industry 4.0 evolution.
all panels related to Project named Sama Sarhan School
availability of 3D Panel layout as shown in this video. This will be inlcuded in all future customers and free of charge.
Completion of fifth batch for the LV Switchgear (MCC Panels) related to TECO Project No. 17082/TC named Ministry of Finance Complex (MOF).
fabrication works for 3x75KW and 1x22KW VFD Panel for M/S F.A. Kettaneh and end client is Fine Hygenic Holding Company.
Tender of 9-2020 to supply 73 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan.
Supply of all panels related to Project named KARAMEH BORDER X-Ray Station
Supply of Automatic Transfer Swtich ChangeOver Type 125A 4P
supply of 2 x Automatic Transfer Swtich 60A CONTACTOR Type with Bypass
tender of 3-SUPPLY-GIZ-2020 to supply 17 No. Auto transformer Panel in variuos sizes for Water Authority of Jordan.