Posts

LOCAL CONTROL PANEL

Jundi Electrical Industry part of TECO Group was awarded the supply of LOCAL CONTROL PANEL Panel for pumping project. The client is Free Engineering Co. F.E.C

Panels were ready for delivery on 06.05.2025

PANELS

Jundi Electrical Industry part of TECO Group was awarded the supply of SMDB and LCP Panel for pumping project. The client is Free Engineering Co. F.E.C

Panels were ready for delivery on 03.05.2025

Movenpick SPA

Jundi Electrical Industry part of TECO Group was awarded the supply of SMDB and FDB Panels for project named Movenpick to  Ahmad Badaweih Est.

Panels were ready for delivery on 07.04.2025

Aqaba University of Technology

Jundi Electrical Industry part of TECO Group was awarded the supply of MDB-Court Panel to Al-Aqaba for Medical Co.

Panels were ready for delivery on 24.03.2025

SoftStarter Panel 75KW

Jundi Electrical Industry part of TECO Group was awarded the supply of  SOFT STARTER 75KW Panel to Muhammad Ali Al-Qawouk Company

Panels were ready for delivery on 05-02-2025

Autotransformer Panel 110KW

Jundi Electrical Industry part of TECO Group was awarded the supply of ATST 110KW to Miyahuna Water Company.

Panels were ready for delivery on 30.12.2024

Aqaba port silos

Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Aqaba port silos Project to Mohamed Al-Aidi & Sons Co. Ltd.

Panels were ready for delivery on 18.01.2024

Brigade – 60 – Zarqa

Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for Brigade – 60 – Zarqa Project to Dirar Saraireh Engineering & Contracting Company

First Batch of Panels were ready for delivery on 09.01.2024

KFAB RETROFIT STUDENT HOUSING

Jundi Electrical Industry part of TECO Group was awarded the supply of Panels for KFAB RETROFIT STUDENT HOUSING Project to The Morganti Group, Inc.

Panels were ready for delivery on 27.12.2023

Autotransformer Panel 110KW

Jundi Electrical Industry part of TECO Group was awarded the supply of ATST 110KW to Miyahuna Water Company.

Panels were ready for delivery on 18.10.2023