Hotel Projects
TECO GROUP is a trusted electrical engineering partner for prestigious hotels and hospitality developments across Jordan and the region. Our hotel portfolio includes internationally recognised brands such as Hilton, Sheraton, and Crown Plaza — where reliable power distribution, efficient motor control, and seamless backup power systems are essential to delivering uninterrupted guest services and building safety around the clock.
Our hotel and hospitality electrical scope of supply includes:
- Main distribution boards (MDB) for primary power intake and distribution across hotel towers, wings, and annexes.
- Sub main distribution boards (SMDB) in Form 2 construction for floor-level, back-of-house, and kitchen distribution.
- Motor control centers (MCC) for chiller plants, air handling units, kitchen ventilation, laundry equipment, and elevator systems.
- Final distribution boards (FDB) for guest room floors, banquet halls, restaurants, spa facilities, and conference areas.
- Automatic power factor correction (APFC) to optimise energy consumption and reduce operating costs across large hotel electrical loads.
- Automatic transfer switches (ATS) for seamless generator-to-mains changeover, ensuring zero interruption to guest services and life safety systems.
Every hotel project is backed by full engineering and quality assurance:
- In-house panel design, engineering, and manufacturing in our own production facility to IEC and NEMA standards.
- Factory acceptance testing including high voltage, insulation, and functional verification before dispatch.
- Thermal imaging inspections and primary injection testing of breaker trip units.
- Site installation, commissioning, and handover.
- Ongoing operation and maintenance support contracts available.
















