TECO GROUP manufactures autotransformer starter panels (ATST) that provide reliable, high-performance reduced-voltage starting for large pump motors, compressors, and industrial drives from 30 KW to 1000 KW. As a long-standing supplier to the Water Authority of Jordan (WAJ) and Miyahuna, we have delivered hundreds of standalone ATST panels for water pumping stations and industrial facilities across the kingdom — each panel factory tested with a 3 kV applied voltage test and issued with a Routine Factory Test (RFT) certificate before dispatch.

Our autotransformer starter panel capabilities include:

  • Motor ratings from 30 KW to 1000 KW — covering the full range of municipal water pump and industrial motor applications.
  • Solid state overload protection options for advanced motor protection and application-specific settings.
  • Front panel status reporting and manual/automatic control operation as standard.
  • Wall-mount (AE type) or free-standing (TS8 type) enclosures — selected based on panel size and site requirements.
  • 100% factory testing on every panel: visual and dimensional check, mechanical operation check, 3 kV applied voltage test for 1 minute, and full electrical and functional verification.
  • Routine Factory Test (RFT) certificate issued with every panel manufactured.
  • Available as standalone panels or integrated within motor control center (MCC) assemblies.

TECO GROUP has supplied autotransformer starter panels for major government and infrastructure tenders:

WAJ Tender 12-2015 — ATST Panels (Interior View)

Interior view of autotransformer starter panels for Water Authority of Jordan Tender 12-2015 by TECO GROUP

WAJ Tender 12-2015 — ATST Panels (Production Line)

Autotransformer starter panels production line for Water Authority of Jordan by TECO GROUP

King Hussein Cancer Center (KHCC) — MCC with Starters

Motor control center with starter panels for King Hussein Cancer Center KHCC by TECO GROUP

Iraq Hospitals — Motor Starter Panels

Motor starter and control center panels for Iraq Hospitals project by TECO GROUP

Send us mail

0 + 4 = ?